Time & Materials Log
Track T&M work with labor hours, materials used, and equipment charges.
T&M Header
Labor
Materials
Equipment
Daily Total
Unlock the full Estimator suite
AI-powered bid intelligence, proposal drafting, and risk analysis, free for 5 days.
Time & Materials Log for field supervisors and project managers
A T&M log tracks ticket number, labor hours, material quantities, equipment charges, markup, daily total, and work description for time-and-materials billing.
This template helps field supervisors and project managers track T&M work with labor hours, materials, and equipment charges. It includes 5 organized sections with 23 professional fields, plus 3 repeatable sections for line items. Fill it out in your browser and export a branded PDF in seconds.
Key Data Points
- ●The header captures project name, date, T&M ticket number, and authorizing contact.
- ●Repeatable labor, material, and equipment sections calculate line totals from hours, quantities, and rates.
- ●The daily total section captures markup percentage, grand total, and work description.
What does this template include?
5 sections with 23 fields covering t&m header, labor, materials, equipment, daily total. Repeatable rows for line items.
How do I export this template?
Fill in the fields online. Click "Export Filled PDF" for a branded document. Or download a blank version to print.
Is this template free?
Yes. 100% free with no account required. Use it as many times as needed for any project.
Who is this template for?
Built for field supervisors and project managers who need to track T&M work with labor hours, materials, and equipment charges.
Related contractor resources
How to Use the Time & Materials Log
- 1Enter project details and T&M ticket number.
- 2Log each worker with trade, hours, and hourly rate.
- 3Record materials used with quantities and unit costs.
- 4Add equipment with hours and rental rates.
- 5Set markup percentage and export the daily T&M log.
Related templates
Other documents contractors use alongside the Time & Materials Log.
Safety Inspection Checklist
Conduct systematic job site safety inspections and document findings.
Use template →
Equipment Usage Log
Track hours, operators, fuel, and maintenance for billing or your own records.
Use template →
Concrete Pour Log
Slump, air, temp, tickets, and mix design in one place.
Use template →