Skip to main content

Port of Long Beach construction bids

Open bids as of Nov 15, 2026

Port of Long Beach is a public agency in California. This page lists its open construction bids with links to the official notices, the portal it posts on, and its award history from official bid tabulations where we hold them.

Open construction bids

3 open as of Nov 15, 2026. Each links to the official notice.

Where it posts bids

Most of Port of Long Beach's bids in our data come from LA RAMP.

Award history

The newest tabulated projects (newest letting May 11, 2026). Low bid is the apparent low bid on the tabulation; award status is not in this data. Bidder names are not shown.

ProjectLettingBiddersLow bidTabulation
LBCT Equipment Procurement: Utility Tractor Rigs (UTRs)May 11, 20263$359,952Official tabulation
HD-S3144 PIER S PAVING AND STORM DRAIN IMPROVEMENTS PROJECT AT PIER S BERTH S102Jan 20, 20267$7,144,760Official tabulation
HD-S3164 PIER B SHOEMAKER BRIDGE RAMPS DEMOLITION AT SHOEMAKER BRIDGEOct 28, 20252$22,341,000Official tabulation
HD-S3145 PIER B ON-DOCK RAIL SUPPORT FACILITY LA-04 PUMP STATION RELOCATIONOct 14, 20256$63,340,000Official tabulation
HD-S3104 SEWER LIFT STATION 101 BACKUP GENERATOR at BETWEEN HARBOR SCENIC DRIVE AND PICO AVENUEOct 14, 20254$1,112,232Official tabulation
HD-S3229 ASPHALT PAVING, TRAFFIC STRIPING, AND RELATED SERVICES, PORT-WIDEAug 26, 20252$6,888,411Official tabulation
HD-S3224 RECYCLING OF ASPHALT, CONCRETE MATERIALS, AND OTHER RELATED SERVICES AT POLB RUBBLE SITEJun 24, 20253$3,400,572Official tabulation
HD-S3195 POLB MAINTENANCE BUILDING C PUMP SHOP CONVERSION at 725 HARBOR PLAZA LONG BEACH, CALIFORNIAMar 25, 20253$1,374,700Official tabulation
On-Call Vessel Maintenance and Repair ServicesMar 12, 20251$10,000,000Official tabulation
HD-S3214 ON-CALL ELECTRICAL CONSTRUCTION PORT-WIDEMar 4, 20254$9,247,567Official tabulation

Port of Long Beach bid results

Typical work types

Counted across its bids in the last 90 days.

  • Facilities (1)
  • General Construction (1)

Bidders per project

Projects with bid tabs
62
Average bidders
3.3
Median bidders
3
Single-bid rate
24.2%