Skip to main content

Port of Long Beach bid results

Updated May 11, 2026 (newest letting in this data)

Aggregates from 62 Port of Long Beach projects in our bid-tab data. Bidder names are not shown.

Projects in data
62
Projects with bid tabs
62
Median bidders per project
3
Single-bid rate
24.2%

Letting calendar

The 12 most recent letting dates in our data.

Letting dateProjectsWith bid tabsSum of low bids
May 11, 202611$359,952
Jan 20, 202611$7,144,760
Oct 28, 202511$22,341,000
Oct 14, 202522$64,452,232
Aug 26, 202511$6,888,411
Jun 24, 202511$3,400,572
Mar 25, 202511$1,374,700
Mar 12, 202511$10,000,000
Mar 4, 202511$9,247,567
Jan 28, 202511$11,972,009
Jan 22, 202511$150,000
Dec 17, 202411$4,155,833

Recent bid results

The newest tabulated projects. Low bid is the apparent low bid on the tabulation; award status is not in this data. Bidder names are not shown.

ProjectCountyLettingBiddersLow bidTabulation
LBCT Equipment Procurement: Utility Tractor Rigs (UTRs)—May 11, 20263$359,952Official tabulation
HD-S3144 PIER S PAVING AND STORM DRAIN IMPROVEMENTS PROJECT AT PIER S BERTH S102—Jan 20, 20267$7,144,760Official tabulation
HD-S3164 PIER B SHOEMAKER BRIDGE RAMPS DEMOLITION AT SHOEMAKER BRIDGE—Oct 28, 20252$22,341,000Official tabulation
HD-S3145 PIER B ON-DOCK RAIL SUPPORT FACILITY LA-04 PUMP STATION RELOCATION—Oct 14, 20256$63,340,000Official tabulation
HD-S3104 SEWER LIFT STATION 101 BACKUP GENERATOR at BETWEEN HARBOR SCENIC DRIVE AND PICO AVENUE—Oct 14, 20254$1,112,232Official tabulation
HD-S3229 ASPHALT PAVING, TRAFFIC STRIPING, AND RELATED SERVICES, PORT-WIDE—Aug 26, 20252$6,888,411Official tabulation
HD-S3224 RECYCLING OF ASPHALT, CONCRETE MATERIALS, AND OTHER RELATED SERVICES AT POLB RUBBLE SITE—Jun 24, 20253$3,400,572Official tabulation
HD-S3195 POLB MAINTENANCE BUILDING C PUMP SHOP CONVERSION at 725 HARBOR PLAZA LONG BEACH, CALIFORNIA—Mar 25, 20253$1,374,700Official tabulation
On-Call Vessel Maintenance and Repair Services—Mar 12, 20251$10,000,000Official tabulation
HD-S3214 ON-CALL ELECTRICAL CONSTRUCTION PORT-WIDE—Mar 4, 20254$9,247,567Official tabulation

Bidders per project

BiddersProjectsShare
11524.2%
21422.6%
31117.7%
458.1%
5+1727.4%