Skip to main content

Wage Determination Finder

Look up Davis-Bacon prevailing wage rates by state, county, and trade classification.

The Wage Determination Finder helps subcontractors look up Davis-Bacon prevailing wage rates by state, county, and trade classification. Every federally funded construction project over $2,000 requires payment of DOL-published prevailing wages and fringes.

Look Up a Wage Classification

Select the state where the project is located

Select your trade to see classification details

Davis-Bacon Quick Reference

Applies toFederal construction contracts over $2,000
Rates sourceDOL Wage and Hour Division via SAM.gov
Update frequencyQuarterly by county
Certified payroll formWH-347 (submit weekly)
Apprentice ratiosPer registered apprenticeship program

The Davis-Bacon Act (40 USC 3141-3148) requires payment of prevailing wages on federally funded or assisted construction contracts over $2,000. Wage determinations are issued by the DOL Wage and Hour Division and specify minimum rates by classification and county.

Example

An electrician working on a federal school renovation in Cook County, IL needs to verify her rate.

StateIllinois
TradeELEC — Electrician (Inside Wireman)
StepSearch SAM.gov for IL wage determination
FringeBase rate + health, pension, vacation fringe
ActionPull WD number → use in WH-347

How to Use This Tool

  1. 1Select the project state from the dropdown menu.
  2. 2Choose the county where work will be performed.
  3. 3Select your trade or occupation classification (e.g., Electrician, Carpenter, Laborer).
  4. 4Choose the project type — building, highway, heavy, or residential — as each has separate rates.
  5. 5Review the wage determination number and rates, then follow the link to the official DOL determination.

How to Apply the Results

Use the found wage determination number to pull the official rates from SAM.gov or the DOL website. Enter the base wage and fringe amounts into the Labor Burden Calculator to get your true burdened cost for bid pricing.

Frequently Asked Questions

See wage data on matched bids in Sub-Hub

AI-powered bid matching for specialty subcontractors — by trade, service area, and certification.

Start 7-Day Trial