Scope Exclusion Builder

Build a trade-specific exclusion checklist for your bid letter so nothing gets assumed into your price.

The Scope Exclusion Builder generates trade-specific scope exclusion checklists for subcontractor bid letters. Select your trade to see 10-15 standard exclusions, toggle items on/off, add custom entries, and copy the formatted list into your quote.

Scope Exclusion Builder

Select your trade to load common exclusions

Select a trade above to load common scope exclusions for your bid letter.

Example

A plumbing sub is bidding a 4-story hotel. They select Plumbing, check off 8 of 12 standard exclusions, then add 'Rooftop mechanical equipment connections' as a custom item.

TradePlumbing
Standard exclusions checked8 of 12
Custom exclusions added1 — Rooftop mechanical equipment connections
Exclusion list ready to paste9-item exclusion list

How to Use This Tool

  1. 1Select your trade from the dropdown to load standard exclusions.
  2. 2Check off the exclusions that apply to this bid.
  3. 3Add any project-specific custom exclusions using the text input.
  4. 4Click Copy to Clipboard and paste the list into your bid letter.

How to Apply the Results

Paste the exclusion list into every bid letter and quote you send. Review it with your estimator before submission to catch anything specific to this project. GCs who see a clear exclusion list are less likely to assume scope into your number.