N°01 — Public Contracts by Work Type
Public paving and roadwork contracts open for bids
$39/mo after a 7-day free trial. Card required, no charge today. Cancel anytime.
N°02 — Live Public Bids
Open Paving & Roadwork Bids
634 open paving & roadwork bids across 39 covered states. Last checked Nov 30, 2026, 6:28 AM UTC.
Every listing is a public solicitation posted by an agency or public owner — not a GC invitation. Smaller trade contracts can often be bid directly; larger prime bids show you which projects to price for the GCs bidding them.
| Project | Agency | Location | Bid due |
|---|---|---|---|
| Engineering Peer Review Proposals | Town of Spencer | MA | Dec 3, 2026 |
| US0075 - Collin County - Routine Maintenance Project - Sealed | TxDOT - Dallas District | Collin | Dec 3, 2026 |
Free access includes 2 current bids. Sub-Hub Pro unlocks the full board.
N°03 — What Counts
What this paving & roadwork board covers
- Asphalt paving, milling and resurfacing
- Pavement striping and markings
- Road, street and parking-lot reconstruction
- Sidewalks, curbs and ADA ramps let as roadwork
Listings are public solicitations from agencies and public owners, matched to this work type by their titles. Bids that do not read as construction work are left out.
N°04 — How to Bid
How to bid public paving & roadwork contracts
1. Check prequalification
Most state DOTs require contractor prequalification before you can bid their lettings. City and county paving bids often do not, so start there if you are not prequalified.
2. Get the plans and the bid schedule
Download the documents from the portal the owner names and price every line of the unit-price bid schedule.
3. Check the tabulations
Past bid tabulations from the same owner show how many firms bid similar work and where the low bids landed.
4. Submit with the required security
Include the bid bond or guarantee and the forms the notice lists, and acknowledge every addendum before the deadline.
N°05 — Get Paving & Roadwork Bid Alerts
See every open paving & roadwork bid, not just the preview.
Sub-Hub Pro shows the full board, matches bids to your trade and service area, and alerts you when new ones post. Start with a 7-day trial.
$39/mo after a 7-day free trial. Card required, no charge today. Cancel anytime.