Skip to main content

N°01 — Public Contracts by Work Type

Public painting contracts open for bids

Start Sub-Hub Pro 7-Day Trial

$39/mo after a 7-day free trial. Card required, no charge today. Cancel anytime.

N°02 — Live Public Bids

Open Painting Bids

19 open painting bids across 11 covered states. Last checked Nov 30, 2026, 6:28 AM UTC.

Every listing is a public solicitation posted by an agency or public owner — not a GC invitation. Smaller trade contracts can often be bid directly; larger prime bids show you which projects to price for the GCs bidding them.

Free access includes 2 current bids. Sub-Hub Pro unlocks the full board.

N°03 — What Counts

What this painting board covers

  • Interior and exterior painting of public buildings
  • Coatings on structures, tanks and light poles
  • Repainting and wall coverings

Listings are public solicitations from agencies and public owners, matched to this work type by their titles. Bids that do not read as construction work are left out.

N°04 — How to Bid

How to bid public painting contracts

  1. 1. Check the specification section

    Public painting specs name the coating systems, surface preparation and any lead-safe work practices. Price to them, not to your usual system.

  2. 2. Register on the owner’s portal

    Download the documents and addenda from the portal the agency names.

  3. 3. Walk the site if you can

    Site visits show access, occupied-building limits and surface condition that drawings miss.

  4. 4. Submit by the deadline in the notice

    Include the forms, insurance certificates and any bid security the notice requires.

N°05 — Get Painting Bid Alerts

See every open painting bid, not just the preview.

Sub-Hub Pro shows the full board, matches bids to your trade and service area, and alerts you when new ones post. Start with a 7-day trial.

Start Sub-Hub Pro 7-Day Trial

$39/mo after a 7-day free trial. Card required, no charge today. Cancel anytime.