A financial report that shows the current billing and profitability status of every active construction project.
Work in Progress (WIP) is a financial schedule prepared by a construction contractor that calculates the earned revenue, costs incurred, billings to date, and resulting over- or under-billing position for each active project. WIP schedules are a key financial statement used by bonding companies, lenders, and CPAs to assess contractor financial health. A deteriorating WIP trend — growing underbillings, declining backlog margin — is an early warning sign of financial distress.
The WIP schedule is where estimating accuracy gets validated against reality, since it reveals whether bid margins are holding as costs are incurred and whether billings are keeping pace with progress. Sureties and lenders read the WIP to set bonding capacity, so a clean, well-managed schedule directly affects how much work a contractor can bid and win.
A GC's controller reviews the monthly WIP, spots a project drifting into underbilling, and works with the PM to accelerate billing on completed scope so cash flow stays positive before the next draw.
Get AI-powered bid alerts, automated form filling, and proposal drafting.
Start Free Trial