Public Construction Bid Index: Q4 2026

Published Oct 18, 2026. Lettings from Oct 1, 2025 to Sep 30, 2026, compared with the year before.

How much competition does public construction work draw? This index counts the bids in official bid tabulations: 4,435 lettings in 14 states, from 8 state DOTs and local agencies on PlanetBids. It reports bidders per letting, the share of lettings that drew a single bid, and how low bids compare with the engineer's estimate, by state and by type of work.

Lettings with official tabulations
4,435
14 states
Average bidders per letting
4.18
Drew exactly one bid
10.1%
Drew five or more bids
35.7%
Median low bid ÷ engineer's estimate
89.8%
TX, IN, SD; 2,537 lettings

Findings

  • Competition rose year over year in the 8 matched states: 3.99 → 4.23 bidders per project, and the single-bid rate went from 10.9% to 9.6%.
  • Single-bid rates ranged from 0.7% (FL, FDOT, PlanetBids agencies) to 26.3% (VA, VDOT).
  • The most bidders per project were in CA (5.85, PlanetBids agencies), the fewest in VA (2.38).
  • Where an engineer's estimate is published (TX, IN, SD), the median apparent low bid came in at 89.8% of the estimate, and 75.7% of low bids were under it.

Year over year

Compared only within the 8 states with at least 30 lettings in both years (AL, CA, FL, IL, IN, NY, SD, TX), so a change in source mix does not move the result.

Matched statesLettingsAverage biddersSingle-bid rateFive or more bidsLow bid ÷ estimate
Oct 1, 2025 – Sep 30, 20264,3064.239.6%36.4%89.8%
Oct 1, 2024 – Sep 30, 20254,8383.9910.9%32.9%88.5%

By state

StateSourceLettingsAverage biddersSingle-bid rateA year earlierFive or more bidsLow bid ÷ estimateLettings through
TexasTxDOT2,1144.647.5%9.2%44.3%90.9%Sep 30, 2026
IllinoisIDOT8122.9019.5%18.3%14.3%—Sep 18, 2026
CaliforniaPlanetBids agencies3895.856.7%12.7%54.0%—Jul 2, 2026
IndianaINDOT2744.242.6%4.8%35.8%82.6%May 7, 2026
New YorkNYSDOT2313.1112.1%11.0%18.2%—Jun 25, 2026
AlabamaALDOT1942.8015.5%8.7%10.3%—Jul 31, 2026
South DakotaSDDOT1504.334.7%8.0%48.0%89.1%Sep 16, 2026
FloridaFDOT, PlanetBids agencies1424.910.7%5.1%51.4%—Jun 30, 2026
VirginiaVDOT802.3826.3%—7.5%—Jan 14, 2026

Not shown, with fewer than 30 lettings each: Ohio (28), Nevada (12), North Carolina (4), Connecticut (3), Oregon (2). Their counts are in the download.

By type of work

Work typeLettingsAverage biddersSingle-bid rateFive or more bidsLow bid ÷ estimate
Roadwork2,2624.1710.3%36.3%89.3%
Highway program (work not named)1,4243.8910.7%31.5%90.8%
General Construction1794.1911.2%33.0%89.8%
Water/Sewer1744.498.6%40.8%83.5%
Concrete1285.864.7%52.3%85.4%
Electrical374.4113.5%32.4%—
Unclassified304.6020.0%33.3%—

Work types with fewer than 30 lettings are in the download. "Highway program (work not named)" is a state DOT letting whose title names no trade, such as a contract number or maintenance shorthand.

By state and type of work

StateWork typeLettingsAverage biddersSingle-bid rateLow bid ÷ estimate
AlabamaRoadwork1932.8015.5%—
CaliforniaWater/Sewer815.387.4%—
CaliforniaRoadwork735.664.1%—
CaliforniaGeneral Construction695.068.7%—
CaliforniaConcrete349.790.0%—
FloridaRoadwork1345.000.7%—
IllinoisRoadwork6342.7920.5%—
IllinoisHighway program (work not named)533.5520.8%—
IllinoisConcrete433.747.0%—
IndianaHighway program (work not named)2744.242.6%82.6%
New YorkRoadwork1693.1113.0%—
South DakotaRoadwork814.164.9%94.1%
TexasHighway program (work not named)9793.9711.0%92.9%
TexasRoadwork9675.324.1%89.1%
TexasGeneral Construction564.575.4%91.2%
TexasConcrete365.115.6%82.0%
VirginiaHighway program (work not named)732.1028.8%—

Cells with at least 30 lettings.

Sources

SourceStatesLettingsWith engineer's estimateNewest letting
TxDOTTX2,1142,114Sep 30, 2026
IDOTIL8120Sep 18, 2026
PlanetBids agenciesCA, CT, FL, NC, NV, OH, OR4460Jul 2, 2026
INDOTIN274274May 7, 2026
NYSDOTNY2310Jun 25, 2026
ALDOTAL1940Jul 31, 2026
SDDOTSD150149Sep 16, 2026
FDOTFL1340Jun 15, 2026
VDOTVA800Jan 14, 2026

Methodology

  • Population. Every letting with a bid-open date in the window and at least one bid in its official tabulation: state DOT bid tabulations, plus results that local agencies publish on PlanetBids. Each letting counts once, and repeated rows are removed. This is not a national sample, and highway work dominates it: TxDOT alone is 48% of lettings.
  • Bidders per letting is the number of bids on the tabulation. Single-bid rate is the share of lettings with exactly one bid.
  • Low bid ÷ engineer's estimate uses only lettings whose source publishes an estimate (TxDOT, INDOT, SDDOT). Below 100% means the low bid came in under the estimate. The low bid is the lowest tabulated bid, an apparent low bid: award status is not in the data.
  • Exclusions. A tabulation whose lowest bid is under $1,000 lists unit prices, not contract totals, so it is left out. An estimate five or more times the low bid is treated as a source typo.
  • Work type is the trade our classifier assigns to the letting title, the same one that sorts bids on this site.
  • Scope. DOT letting programs are counted as published, maintenance and material contracts included.
  • Small cells. Any rate or median based on fewer than 30 lettings is suppressed.
  • Lag. Agencies publish tabulations weeks to months after a letting, so the newest quarter is thinner for some states (see "Lettings through"). Year-over-year changes compare each state with itself.
  • Names. The index reports aggregates only. It names no bidder or contractor.

Download and cite

Every table cell on this page, including the cells too small to show and the year-earlier figures, is in the CSV. Download public-construction-bid-index-2026q4.csv

ConstructionBids.ai. "Public Construction Bid Index: Q4 2026." Published Oct 18, 2026. https://constructionbids.ai/public-construction-bid-index

Please cite the scope with any figure: lettings with official bid tabulations from state DOTs and PlanetBids agencies, not all public construction. Questions: support@constructionbids.ai.