Skip to main content
Market Readiness

K-12 School Construction Bids by State

December 15, 2025Updated October 28, 20269 min readConstructionBids.ai TeamReviewed by Haithum Abdelfattah, Founder & CEO
Back to Blog

At a glance

K-12 school work adds rules other public projects don't have. California requires Division of the State Architect approval before award, Florida screens contractors who work on campus while students are present, Texas districts procure construction under Government Code Chapter 2269, and Massachusetts routes most school projects through the MSBA.

What you need to know

  • In California, DSA must approve school plans before a construction contract can be awarded, and changes need DSA approval before the work starts.
  • Florida requires fingerprint-based checks for contractors and their subs on school grounds while students are present, with exemptions for fenced, separated sites.
  • Texas CMAR school projects must publicly advertise the trade work, which is a direct opening for subcontractors.

Ready to find bids that match your trade?

Thousands of verified public-bid sources. Cancel anytime.

Start 7-Day Free Trial

California: DSA approval and project inspectors

In California, the Division of the State Architect (DSA) oversees design and construction for K-12 schools and community colleges. Three of its rules shape a contractor's job:

  • Approval before award. DSA's own guidance says construction "must be reviewed and approved by DSA, except as noted below, before a contract for construction can be awarded." Additions are reviewed whatever their size or cost, and projects can't be split up to avoid review.
  • A DSA-certified project inspector. The district must hire a DSA-certified inspector to oversee construction, approved by the owner, the design professionals and DSA, and approved again for every project.
  • Changes go through DSA first. Changes to approved drawings and specifications for DSA-regulated work must be approved by DSA before that work begins. At closeout, the contractor files a verified report with DSA, along with the designers and the inspector.

For pricing, the inspector and the change process matter most. A field change that would be a quick RFI answer on a private job waits for DSA on a school, so build that time into the schedule.

Bid thresholds. Under Public Contract Code 20111, as the California Department of Education's December 2025 letter explains, school district public projects have a bid threshold of $15,000 that is not adjusted for inflation. The inflation-adjusted figure ($119,100 from January 1, 2026) applies to equipment, supplies and non-construction services, not construction.

Contractor employees and pupils. Education Code 45125.2 requires districts to take precautions with construction contractors' employees on school sites, and the state still reimburses districts for that work under claiming instructions revised in October 2025. Ask the district which precaution it uses before you price access, phasing and site supervision.

Florida: screening contractors on campus

Florida's background screening rules for school contractors, first enacted in 2005 as the Jessica Lunsford Act, are now in Florida Statutes 1012.465, 1012.467 and 1012.468.

  • Who is covered. A fingerprint-based criminal history check is required for each noninstructional contractor permitted on school grounds when students are present. The definition includes the contractor's employees and "any subcontractor and its employees." School grounds don't count during periods when students aren't permitted access.
  • The badge. Screened contractors carry a uniform statewide identification badge, valid for 5 years and recognized by every district. It must be visible at all times.
  • Exemptions that matter for construction. A contractor is exempt when under direct supervision, meaning a district employee or contractor is physically present whenever the contractor has access to a student. A site separated from students by a single 6-foot chain-link fence is also exempt. So is a licensed contractor who completed a qualifying check within the last 5 years. Exempt contractors are still checked against the sexual offender registries, at no charge.
  • The penalties. A contractor with a disqualifying conviction who is on school grounds in violation of the law commits a third-degree felony. Contractors must report an arrest for a disqualifying offense to the district within 48 hours.
  • Who pays. The cost of the check may be borne by the school board, the contractor or the person fingerprinted. Read the bid documents to see which.

The fence exemption is a planning decision as much as a legal one. A fenced, separated site avoids screening every worker, while work inside an occupied building usually can't.

Texas: procurement methods in the education code

Texas Education Code 44.031 requires district contracts valued at $100,000 or more in the aggregate for each 12-month period to be made by the method that provides the best value. For construction services, the statute points to Government Code Chapter 2269, which applies to school districts by name. Notice is published in the county where the district's central office sits, once a week for at least two weeks before the deadline.

Chapter 2269 gives districts several methods:

MethodHow the contract is awarded
Competitive biddingTo the lowest responsible bidder
Competitive sealed proposalsProposals are ranked, then negotiated, then the general contractor is selected
Construction manager-at-riskThe CMAR is the general contractor, at a contracted price that may be a guaranteed maximum price
Design-buildOne contract for design and construction, with a team that includes an architect or engineer and a contractor

For any method other than low bid, the district must decide before advertising which method gives the best value, and publish its evaluation criteria, their weights and its scoring method. Evaluations become public within 7 days of award.

For subcontractors, CMAR is the opening. A construction manager-at-risk must publicly advertise for bids or proposals from trade contractors and subcontractors. It can self-perform a portion only by bidding it the same way as everyone else, and trade bids become public after award. Our guide to construction project delivery methods covers how CMAR and design-build differ for subs.

Two more Texas rules affect the contract itself. A contractor must give the district advance notice if it, or an owner or operator, has been convicted of a felony (Education Code 44.034). Change orders on a contract of $1 million or more can't raise the price by more than 25 percent (44.0411).

Massachusetts: MSBA projects

In Massachusetts, the Massachusetts School Building Authority (MSBA) funds capital improvement projects in public schools, from one penny of the state's 6.25 percent sales tax. The MSBA says its grant program supports more than $1 billion a year in construction bids, with projects forecast to bid through 2027.

On MSBA projects:

  • An owner's project manager (OPM) is required when construction cost is estimated at $1.5 million or more, and the MSBA must approve the OPM.
  • The OPM sits on the CM-at-risk prequalification and selection committees, so on a CM-at-risk school job you will meet the OPM during prequalification and selection.
  • The MSBA's Designer Selection Panel picks designers for projects of $5 million or more.
  • On state-funded municipal building contracts, including MSBA projects, participation counts toward diversity goals only from firms certified by the Supplier Diversity Office as an MBE, WBE or VBE when the contract is signed.

See the Massachusetts construction bids page for the state's portals.

Federal money on school projects

A school project funded with federal money can carry federal labor rules. The Department of Labor's Davis-Bacon rules apply to contractors and subcontractors on federally funded or assisted construction contracts over $2,000. Check the funding sources in the bid documents, and see our Davis-Bacon prevailing wage guide for how certified payroll works. State prevailing wage laws can apply on top of that.

Before you bid a school job

CheckWhy it matters
Does the state require plan approval, such as California's DSA?It controls when the contract can be awarded and how changes get approved
Will crews work on campus while students are present?It triggers background screening or supervision rules in states like Florida and California
Can the work area be fenced off from students?In Florida, a 6-foot chain-link separation exempts the site from screening
Which procurement method is the district using?Low bid, CMAR and design-build each change who you bid to and how you are scored
Who is the owner's project manager?On MSBA projects, the OPM shapes CM prequalification and selection
Is there federal money in the project?Davis-Bacon can apply on top of state wage rules
What is the summer work window?School calendars compress the schedule; check the phasing plan in the bid documents

For prequalification packets, see our prequalification requirements guide. State-level portals are on the California, Florida and Texas state pages.

Sources

All sources were read on October 28, 2026.

Frequently Asked Questions

Do contractors need background checks to work on school construction sites?

It depends on the state. Florida requires a fingerprint-based criminal history check for noninstructional contractors, including subcontractors and their employees, who are on school grounds while students are present, with exemptions such as a site separated by a 6-foot chain-link fence. California requires districts to take precautions with construction contractors' employees under Education Code 45125.2. Check the district's requirements before you price access and phasing.

What is DSA approval for California schools?

The Division of the State Architect reviews and approves construction for public K-12 schools and community colleges. Its approval must come before a construction contract can be awarded, the district must hire a DSA-certified inspector, and changes to approved drawings need DSA approval before the work starts.

How do Texas school districts procure construction?

Education Code 44.031 sends construction services through Government Code Chapter 2269, which allows competitive bidding, competitive sealed proposals, construction manager-at-risk, design-build and other methods. For any method other than low bid, the district must publish its evaluation criteria and their weights.

What does the MSBA do on Massachusetts school projects?

The Massachusetts School Building Authority funds capital improvement projects in public schools. On its projects, an owner's project manager is required when construction cost is estimated at $1.5 million or more, and the MSBA's Designer Selection Panel picks designers for projects of $5 million or more.

Does Davis-Bacon apply to school construction?

Davis-Bacon applies to federally funded or assisted construction contracts over $2,000. A school project with federal money in it may be covered, so check the funding sources in the bid documents. State prevailing wage laws can apply separately.

Related Articles

Complete your stack with public & government bids.

ConstructionBids.ai fills the public-procurement gap with official source links, matching, alerts, risk review, and bid-decision workflow.

7-day free trialCancel anytimeThousands of verified sources