Back to Blog
Guides

Construction Bidding for Water and Wastewater Infrastructure Projects

December 19, 2025
11 min read
CBConstructionBids.ai Team
Construction Bidding for Water and Wastewater Infrastructure Projects

Water and wastewater infrastructure represents a stable, growing segment of public construction. These projects—from treatment plants to distribution systems—require specialized knowledge and careful bidding approaches. Understanding the unique requirements of water/wastewater work positions contractors for success in this essential market.

Water/Wastewater Project Categories

The water sector encompasses diverse project types with varying complexity.

Treatment Facilities

Water treatment plants:

  • Source water intake structures
  • Chemical treatment systems
  • Filtration and membrane systems
  • Disinfection facilities
  • Clearwell and storage
  • Administrative and lab buildings

Wastewater treatment plants:

  • Headworks and screening
  • Primary and secondary treatment
  • Tertiary treatment and filtration
  • Solids handling and digestion
  • Disinfection systems
  • Effluent discharge structures

Conveyance Systems

Water distribution:

  • Transmission mains (large diameter)
  • Distribution mains
  • Service connections
  • Pressure reducing/sustaining stations
  • Water storage tanks and reservoirs

Wastewater collection:

  • Gravity sewers
  • Force mains
  • Lift/pump stations
  • Manholes and structures
  • Trenchless installations

Specialty Structures

  • Pump stations
  • Elevated storage tanks
  • Ground storage reservoirs
  • Chemical feed buildings
  • Electrical/control buildings
  • Emergency generators

Understanding Water/Wastewater Specifications

These projects have extensive technical specifications requiring careful review.

Key Specification Divisions

Division 01 - General Requirements:

  • Startup and commissioning procedures
  • Operations training requirements
  • Spare parts and O&M manual requirements
  • SCADA integration protocols

Division 31 - Earthwork:

  • Trench excavation and backfill
  • Dewatering requirements
  • Soil compaction testing
  • Sheeting and shoring

Division 33 - Utilities:

  • Pipe materials and installation
  • Joint restraint requirements
  • Testing and disinfection
  • Connection to existing systems

Divisions 40-46 - Process Equipment:

  • Pumps and motors
  • Valves and actuators
  • Process piping
  • Treatment equipment

Equipment Specifications

Water/wastewater projects are equipment-intensive:

  • Review equipment schedules carefully
  • Verify sole-source vs. competitive items
  • Check submittal requirements
  • Note startup and training provisions
  • Identify warranty requirements

Estimating Water/Wastewater Projects

Accurate estimates require understanding the unique cost drivers.

Earthwork and Excavation

Pipeline installation factors: | Depth | Production Factor | |-------|------------------| | 0-6 ft | 1.0 (base) | | 6-10 ft | 1.15 | | 10-15 ft | 1.35 | | 15-20 ft | 1.60 | | 20+ ft | 1.90+ |

Soil condition adjustments:

  • Rock excavation: 2.0-4.0x base cost
  • High groundwater: Add dewatering costs
  • Contaminated soil: Special handling required
  • Existing utilities: Potholing and relocation

Pipe Material Costs

Common pipe materials and considerations:

  • Ductile iron: Standard for water mains, moderate cost
  • PVC/HDPE: Lower cost, limited applications
  • Concrete cylinder pipe: Large diameter transmission
  • Fiberglass (FRP): Corrosive environments
  • Stainless steel: Process piping applications

Include costs for:

  • Pipe and fittings
  • Joint restraints and thrust blocks
  • Bedding and backfill materials
  • Testing and disinfection

Equipment Installation

Treatment facility equipment requires:

  • Specialized rigging and setting
  • Mechanical installation labor
  • Electrical and controls work
  • Startup and commissioning
  • Training and documentation

Factor in manufacturer representative time for equipment startup supervision.

Managing Project Risks

Water/wastewater projects carry specific risks that affect bidding.

Site Condition Risks

Geotechnical concerns:

  • Groundwater levels and dewatering needs
  • Rock and difficult excavation
  • Unstable soils and shoring requirements
  • Contamination from previous land uses

Request and review:

  • Geotechnical reports
  • Environmental assessments
  • Existing utility records
  • Survey and topographic data

Existing Facility Risks

Many projects involve work at operating facilities:

  • Maintaining operations during construction
  • Bypass pumping requirements
  • Scheduled shutdowns and tie-ins
  • Odor and nuisance control
  • Safety around hazardous atmospheres

Schedule Risks

Common schedule challenges:

  • Equipment lead times (pumps, valves, instruments)
  • Permit delays (environmental, agency)
  • Weather impacts on earthwork
  • Coordination with facility operations
  • Testing and commissioning duration

Compliance Requirements

Water/wastewater projects have extensive regulatory requirements.

Environmental Compliance

Construction permits:

  • NPDES stormwater permits
  • Dewatering discharge permits
  • Air quality permits (for certain operations)
  • Wetland and stream crossing permits

Environmental protection:

  • Erosion and sediment control
  • Spill prevention and response
  • Noise and vibration limits
  • Tree and habitat protection

Health and Safety

Confined space entry:

  • Manholes and vaults
  • Tanks and basins
  • Pipeline work
  • Permit-required entry programs

Hazardous atmospheres:

  • Hydrogen sulfide exposure
  • Oxygen deficiency
  • Methane accumulation
  • Chemical handling

Include safety equipment and training costs in your bid.

Regulatory Agency Requirements

  • State drinking water agency approval
  • EPA discharge permit compliance
  • State environmental agency oversight
  • Local health department requirements

Bidding Strategies for Water/Wastewater

Develop approaches specific to this market segment.

Public Bidding Considerations

Most water/wastewater work is publicly bid:

  • Competitive sealed bidding
  • Lowest responsible bidder selection
  • Detailed specification compliance
  • Bid bond and performance bond requirements

Building Agency Relationships

Water utilities and municipalities value:

  • Experience with similar facilities
  • Local presence and responsiveness
  • Track record of successful projects
  • Understanding of utility operations

Qualification Requirements

Many projects require prequalification:

  • Financial capacity documentation
  • Experience with similar project types
  • Key personnel qualifications
  • Safety record (EMR requirements)
  • Bonding capacity verification

Subcontractor Coordination

Water/wastewater projects require specialized subcontractors.

Key Specialty Contractors

Mechanical/process:

  • Equipment installation
  • Process piping
  • HVAC systems
  • Plumbing

Electrical/instrumentation:

  • Power distribution
  • Motor controls
  • Instrumentation and controls
  • SCADA systems

Specialty trades:

  • Concrete and structural
  • Coatings and linings
  • Fencing and site work
  • Landscaping and restoration

Subcontractor Evaluation

For water/wastewater work, verify:

  • Experience at operating facilities
  • Understanding of utility operations
  • Confined space and safety capabilities
  • Availability for startup support
  • Warranty service capabilities

Equipment Procurement

Equipment selection and procurement significantly impacts bids.

Evaluating Equipment Options

When specs allow alternatives:

  • Compare lifecycle costs (energy, maintenance)
  • Verify local service availability
  • Check spare parts compatibility with owner's existing equipment
  • Assess delivery schedules
  • Review warranty terms

Working with Equipment Vendors

During bidding:

  • Request budgetary pricing early
  • Get firm quotes before bid day
  • Clarify scope of supply
  • Verify delivery schedules
  • Confirm startup support

Equipment categories to quote:

  • Pumps and motors
  • Blowers and compressors
  • Valves and actuators
  • Instrumentation
  • Chemical feed systems
  • Electrical equipment

Startup and Commissioning

Water/wastewater projects have extensive startup requirements.

Planning for Commissioning

Include costs for:

  • Pre-startup testing
  • Equipment commissioning
  • Process startup
  • Performance testing
  • Operator training

Coordination with Operations

  • Schedule startup activities with owner
  • Plan for facility operational constraints
  • Coordinate with regulatory inspections
  • Document as-built conditions
  • Provide O&M documentation

Pricing and Markup Considerations

Determine appropriate pricing for water/wastewater work.

Cost Structure

Typical cost distribution:

  • Earthwork/site: 15-25%
  • Concrete/structural: 15-20%
  • Mechanical/process: 25-35%
  • Electrical/I&C: 15-20%
  • General conditions: 8-12%

Markup Factors

Consider when setting markup:

  • Project complexity and risk
  • Competition level in market
  • Owner's budget constraints
  • Schedule pressure
  • Experience with project type

Contingency Considerations

Include contingency for:

  • Unknown soil conditions
  • Existing utility conflicts
  • Facility operational issues
  • Equipment delivery delays
  • Permit and inspection delays

Technology in Water/Wastewater Bidding

Leverage technology for competitive advantage.

Estimating Software

Specialized tools:

  • Civil 3D for pipeline design
  • Pipe estimating software
  • Equipment pricing databases
  • GPS machine control takeoffs

Document Management

Water/wastewater bid packages are extensive:

  • Organize by specification section
  • Track equipment submittals
  • Manage vendor quote correspondence
  • Document RFI responses

ConstructionBids.ai provides early notification of water and wastewater infrastructure projects. Track treatment plants, pipeline projects, and pump stations from planning through bid advertisement.

Related Articles

ConstructionBids.ai LogoConstructionBids.ai

AI-powered construction bid discovery platform. Find government and private opportunities from 2,000+ sources across all 50 states.

support@constructionbids.ai

Disclaimer: ConstructionBids.ai aggregates publicly available bid information from government sources. While we strive to provide accurate and up-to-date information, we do not guarantee the accuracy, completeness, or timeliness of any bid data. Users should verify all information with the original source before making business decisions. ConstructionBids.ai is not affiliated with any government agency.

Data Sources: Bid opportunities are sourced from federal, state, county, and municipal government portals including but not limited to SAM.gov, state procurement websites, and local government bid boards. All data remains the property of the respective government entities.

© 2025 ConstructionBids.ai. All rights reserved.
Made in the USAPrivacyTerms