Skip to main content

TxDOT - Dallas District construction bids

Open bids as of Nov 15, 2026

TxDOT - Dallas District is a public agency in Texas. This page lists its open construction bids with links to the official notices, the portal it posts on, and its award history from official bid tabulations where we hold them.

It is a district of the Texas Department of Transportation, whose page lists every district.

Open construction bids

20 open as of Nov 15, 2026; the 10 soonest deadlines are listed. Each links to the official notice.

Where it posts bids

Most of TxDOT - Dallas District's bids in our data come from TxDOT.

Award history

The newest tabulated projects (newest letting Oct 14, 2026). Low bid is the apparent low bid on the tabulation; award status is not in this data. Bidder names are not shown.

ProjectLettingBiddersLow bidTabulation
BPM Denton Underseal FY 27Oct 14, 20266$83,076Official tabulation
Flexible Pavement Str Repair 771 26-27Oct 14, 20267$622,508Official tabulation
FY 27 BPM KaufmanOct 14, 20263$341,942Official tabulation
On Call Traffic Control FY 27 Denton COOct 14, 20263$757,316Official tabulation
Reflectorized Pavement Markings 09 10/26Oct 14, 20262$453,554Official tabulation
Winter Weather Material 09 0926Oct 14, 20261$446,751Official tabulation
Limestone Rock Asphalt 09 1026Oct 14, 20262$197,064Official tabulation
Repair/Replace Conc Barrier Denton FY 27Oct 14, 20263$166,500Official tabulation
Concrete Structure Repair KRAO FY'27Oct 14, 20264$203,140Official tabulation
Rock/Riprap Materials 09 1026Oct 14, 20265$105,000Official tabulation

Texas Department of Transportation bid results

Typical work types

Counted across its bids in the last 90 days.

  • Roadwork (20)

Bidders per project

Projects with bid tabs
485
Average bidders
4.7
Median bidders
4
Single-bid rate
7.4%