Home / Agencies / North Carolina / STATE OF NC - CONSTRUCTION OFFICE STATE OF NC - CONSTRUCTION OFFICE construction bids Open bids as of Nov 15, 2026
STATE OF NC - CONSTRUCTION OFFICE is a public agency in North Carolina. This page lists its open construction bids with links to the official notices, the portal it posts on, and its award history from official bid tabulations where we hold them.
Open construction bids 10 open as of Nov 15, 2026. Each links to the official notice.
Project Deadline Work type Cabarrus YDC BAS Renovation Nov 17, 2026 Mechanical Western North Carolina Veterans Cemetery -Phase 2 Repairs The basic project scope as described in the drawings and specifications shall include but is not limited to various work at the Chapel: reroofing with a prefinish Nov 17, 2026 Roofing NCCIW: Dormitories D, E, F & G Fire Alarm Replacement The existing conventional fire alarm systems in dormitories D, E, F, and G were installed in 1994 and are now obsolete. Because these systems have reached the end of Nov 19, 2026 Electrical Black Mountain Veterans Home HVAC Replacement – Phase 1 The project consists of replacing the existing geothermal heat pump units serving the Main Kitchen, Laundry Room and all occupant rooms with new air-cooled DX units Nov 24, 2026 Mechanical RE-BID for Wake CC: Fire Alarm Replacement Nov 30, 2026 Electrical Campus Roof Repairs Nov 30, 2026 Roofing New Revenue Building Security Upgrades Dec 3, 2026 General Construction SBI Logistics Building Dec 4, 2026 Facilities Pitt Community College Dec 8, 2026 Roofing SOMERSET PLACE – POTABLE WATER SUPPLY WELL-This project consists of the installation of a Potable Water Supply Well for a future Visitor Center that will be constructed at the Somerset Place Historic Site. Dec 8, 2026 General Construction
Typical work types Counted across its bids in the last 90 days.
Roofing (3) Electrical (2) General Construction (2) Mechanical (2) Facilities (1) Get STATE OF NC - CONSTRUCTION OFFICE bid alerts Get an alert when STATE OF NC - CONSTRUCTION OFFICE posts a new construction bid, alongside public bids from thousands of portals. Start a 7-day free trial to set up bid alerts.
Start Free Trial