North Carolina Department of Transportation Division 11 construction bids
Open bids as of Nov 7, 2026
North Carolina Department of Transportation Division 11 is a public agency in North Carolina. This page lists its open construction bids with links to the official notices, the portal it posts on, and its award history from official bid tabulations where we hold them.
Open construction bids
5 open as of Nov 7, 2026. Each links to the official notice.
| Project | Deadline | Work type |
|---|---|---|
| NCDOT DK00484: Grading, Paving, Drainage, and Structure | Nov 19, 2026 | Water/Sewer |
| NCDOT DK00498: Microsurfacing | Nov 19, 2026 | Roadwork |
| NCDOT DK00502: Resurfacing, Shoulder Reconstruction, Milling, Pavement Markings, and Pavement Markers | Nov 19, 2026 | Roadwork |
| NCDOT DK00507: Curb Ramps and Signals | Nov 19, 2026 | Concrete |
| NCDOT DK00508: Curb Ramps and Signals | Nov 19, 2026 | Concrete |
Typical work types
Counted across its bids in the last 90 days.
- Concrete (2)
- Roadwork (2)
- Water/Sewer (1)