Western Municipal Water District construction bids
Open bids as of Oct 22, 2026
Western Municipal Water District is a public agency in California. This page lists its open construction bids with links to the official notices, the portal it posts on, and its award history from official bid tabulations where we hold them.
Open construction bids
5 open as of Oct 22, 2026. Each links to the official notice.
| Project | Deadline | Work type |
|---|---|---|
| WRCRWA Primary Clarifier #2 Rehabilitation | Oct 26, 2026 | General Construction |
| Holcomb Pump Station External Stair Project Limited Engineering and Bid-Document Services | Oct 27, 2026 | Water/Sewer |
| HVAC Preventative Maintenance, Repair, and Emergency Response Services | Nov 5, 2026 | Mechanical |
| PFAS Treatment at Arlington Desalter Plant | Nov 5, 2026 | Water/Sewer |
| RFP: Engineering Design Services for Abington Sewer Replacement Project | Nov 19, 2026 | Water/Sewer |
Award history
The newest tabulated projects (newest letting Nov 4, 2025). Low bid is the apparent low bid on the tabulation; award status is not in this data. Bidder names are not shown.
| Project | Letting | Bidders | Low bid | Tabulation |
|---|---|---|---|---|
| Roof Replacement Project - Arlington Desalter (ADS) Administration Building | Nov 4, 2025 | 10 | $104,949 | Official tabulation |
| On-Call Emergency Asphalt and Paving Repairs | Mar 25, 2025 | 7 | $202,086 | Official tabulation |
| Roof Replacement Project | Sep 19, 2024 | 6 | $79,550 | Official tabulation |
| Well 7 Equipping Prepurchase of Electrical Equipment | Aug 8, 2024 | 3 | $100,725 | Official tabulation |
| Water Meter Replacement Project - Phase III | Dec 14, 2023 | 6 | $160,537 | Official tabulation |
| North Well 2 Treatment - Concrete Construction | Oct 25, 2023 | 6 | $157,910 | Official tabulation |
| Hillside Potable Water Reservoirs No. 1 and No. 2 Rehabilitation (W-309) | Sep 7, 2023 | 5 | $1,590,100 | Official tabulation |
| Water Main Replacement Project Westerly Dr, New Ridge Dr, Bay Bridge Dr, Riverside Ave & Dallas Ave | Mar 2, 2023 | 6 | $3,404,064 | Official tabulation |
| WRCRWA Anaerobic Digester #3 -- Construction (W-275) | Oct 14, 2021 | 6 | $6,719,380 | Official tabulation |
Typical work types
Counted across its bids in the last 90 days.
- Water/Sewer (3)
- General Construction (1)
- Mechanical (1)
Bidders per project
- Projects with bid tabs
- 9
- Average bidders
- 6.1
- Median bidders
- 6
- Single-bid rate
- 0.0%