Skip to main content

Transportation Corridor Agencies (TCA) construction bids

Open bids as of Nov 15, 2026

Transportation Corridor Agencies (TCA) is a public agency in California. This page lists its open construction bids with links to the official notices, the portal it posts on, and its award history from official bid tabulations where we hold them.

Open construction bids

1 open as of Nov 15, 2026. Each links to the official notice.

ProjectDeadlineWork type
Roadside Toll Collection System (RTCS)Dec 9, 2026—

Award history

The newest tabulated projects (newest letting Apr 20, 2026). Low bid is the apparent low bid on the tabulation; award status is not in this data. Bidder names are not shown.

ProjectLettingBiddersLow bidTabulation
Water and Wastewater ServicesApr 20, 20262$410,483Official tabulation
HVAC Maintenance and Repair ServicesMay 15, 20246$3,302Official tabulation
Landscape Maintenance and Repair ServicesNov 18, 20223$151,311Official tabulation
Silverado Fire Damaged Toll Plaza Landscape RepairOct 6, 20212$1,121,950Official tabulation
Silverado Fire Damaged Toll Plaza Stair RepairOct 5, 20212$583,986Official tabulation
Silverado Fire Damaged Toll Plaza Building RepairOct 4, 20211$343,500Official tabulation
HVAC Maintenance and Repair ServicesApr 23, 20213$31,675Official tabulation
Water and Wastewater Systems Inspection, Maintenance and Repair ServicesFeb 24, 20212$987,388Official tabulation
Signage Enhancements - Civil ConstructionNov 9, 20184$2,299,061Official tabulation
Water and Wastewater System Inspection, Maintenance and Repair ServicesMar 6, 20181$283,652Official tabulation

Bidders per project

Projects with bid tabs
15
Average bidders
2.6
Median bidders
2
Single-bid rate
20.0%