San Diego Metropolitan Transit System (MTS) construction bids
Open bids as of Nov 15, 2026
San Diego Metropolitan Transit System (MTS) is a public agency in California. This page lists its open construction bids with links to the official notices, the portal it posts on, and its award history from official bid tabulations where we hold them.
Award history
The newest tabulated projects (newest letting Apr 16, 2026). Low bid is the apparent low bid on the tabulation; award status is not in this data. Bidder names are not shown.
| Project | Letting | Bidders | Low bid | Tabulation |
|---|---|---|---|---|
| James R Mills Building - Replacement of Doors IFB | Apr 16, 2026 | 5 | $69,500 | Official tabulation |
| KMD Concrete Lot Replacement | Jan 9, 2026 | 17 | $494,948 | Official tabulation |
| Bus Fleet Seat Upholstery Replacement and Repair Services | Dec 30, 2025 | 2 | $369,088 | Official tabulation |
| Purchase of Water | Dec 16, 2025 | 2 | $387,422 | Official tabulation |
| Buildings A&C Wheel Truing Machines Removal and Construction | Oct 31, 2025 | 1 | $615,760 | Official tabulation |
| Annual Preventative Maintenance Inspections and As-Needed Repair Services for Generators | Aug 25, 2025 | 2 | $82,050 | Official tabulation |
| Purchase of Safety and Water Supplies | Jul 24, 2025 | 3 | $1,323,421 | Official tabulation |
| Orange Line (OL) Phase 1 Construction IFB | Feb 6, 2025 | 5 | $26,890,733 | Official tabulation |
| East County Bus Maintenance Facility (“ECBMF”) Battery Storage Shelter Project | Nov 22, 2024 | 2 | $143,016 | Official tabulation |
| East County Bus Maintenance Facility Bird Control | Sep 20, 2024 | 1 | $104,000 | Official tabulation |
Bidders per project
- Projects with bid tabs
- 51
- Average bidders
- 3.6
- Median bidders
- 3
- Single-bid rate
- 15.7%