Skip to main content

Foothill-De Anza Community College District construction bids

Open bids as of Nov 15, 2026

Foothill-De Anza Community College District is a public agency in California. This page lists its open construction bids with links to the official notices, the portal it posts on, and its award history from official bid tabulations where we hold them.

Award history

The newest tabulated projects (newest letting Dec 17, 2024). Low bid is the apparent low bid on the tabulation; award status is not in this data. Bidder names are not shown.

ProjectLettingBiddersLow bidTabulation
Bid #1930-114-802 SVC HVAC System Improvement and Classroom Reno.Dec 17, 20244$9,705,000Official tabulation
D-120 HVAC Installation and AlterationsOct 9, 20248$1,964,500Official tabulation
Bid 1915-204 Convert Existing Facility to Beach Volleyball at De Anza CollegeMay 8, 20242$5,150,000Official tabulation
Bid 1923-203-206 Upgrade L1 Flat Roof De Anza CollegMar 12, 20242$171,000Official tabulation
Bid Document #1920-509-511: Demolition of the Flint Center, Utilities, & Associated Work at De Anza CollegeFeb 8, 202410$4,913,635Official tabulation
Bid Document #1916-106 Project 106: Exterior Site Concrete Accessible Path, Foothill CollegeFeb 6, 20244$760,621Official tabulation
Water Rescue-Thoracic Trauma Toddler ManikinJan 30, 20241$14,880Official tabulation
Dry-Rot and Concrete Repairs at Foothill CollegeOct 25, 20232$186,997Official tabulation
HVAC Suction Diffuser PartsMay 24, 20231$34,032Official tabulation
Bid 1903 Roof Replacements FHC Bldgs 1200, 3000 & 4100May 11, 20234$654,563Official tabulation

Bidders per project

Projects with bid tabs
26
Average bidders
2.5
Median bidders
1
Single-bid rate
53.8%