Department of Transportation construction bids
Open bids as of Nov 15, 2026
Department of Transportation is a public agency in California. This page lists its open construction bids with links to the official notices, the portal it posts on, and its award history from official bid tabulations where we hold them.
Open construction bids
11 open as of Nov 15, 2026; the 10 soonest deadlines are listed. Each links to the official notice.
| Project | Deadline | Work type |
|---|---|---|
| Modify existing drainage, replace lighting systems, and install TMS. | Nov 17, 2026 | Electrical |
| Modify the existing traffic control signals. | Nov 17, 2026 | Roadwork |
| Curb ramp, CRCP, JPCP, HMA, electrical, erosion control, and planting. | Nov 17, 2026 | Concrete |
| Replace bridge, widen Rdwy, railroad, drainage, Elect and landscape. | Nov 18, 2026 | Landscaping |
| Landscape planting. | Nov 18, 2026 | Landscaping |
| Construct maintenance station. | Nov 18, 2026 | General Construction |
| Cold plane, HMA, curb ramp, culvert, and modify electrical system. | Nov 18, 2026 | Concrete |
| Install lighting, striping, and signage upgrades. | Nov 19, 2026 | Roadwork |
| Construct new interchange, Rdwy Ex, IB, HMA, RHMA, & structural Conc. | Nov 19, 2026 | Roadwork |
| Construct treatment BMPs for stormwater mitigation. | Nov 19, 2026 | Environmental |
Where it posts bids
Most of Department of Transportation's bids in our data come from Cal eProcure.
Typical work types
Counted across its bids in the last 90 days.
- Roadwork (3)
- Concrete (2)
- Landscaping (2)
- Electrical (1)
- Environmental (1)
- General Construction (1)