Skip to main content

County of El Dorado construction bids

Open bids as of Oct 22, 2026

County of El Dorado is a public agency in California. This page lists its open construction bids with links to the official notices, the portal it posts on, and its award history from official bid tabulations where we hold them.

Open construction bids

2 open as of Oct 22, 2026. Each links to the official notice.

Award history

The newest tabulated projects (newest letting Oct 4, 2023). Low bid is the apparent low bid on the tabulation; award status is not in this data. Bidder names are not shown.

ProjectLettingBiddersLow bidTabulation
2023/24 Hybrid All-Wheel Drive/4 Wheel Drive, Midsize Sport Utility Vehicle, 4-DoorOct 4, 20231$68,830Official tabulation
Plant Mix Asphalt Concrete - East SlopeSep 30, 20211$387,062Official tabulation

Typical work types

Counted across its bids in the last 90 days.

  • Environmental (1)
  • Roadwork (1)

Bidders per project

Projects with bid tabs
2
Average bidders
1.0
Median bidders
1
Single-bid rate
100.0%