Skip to main content

City of Torrance construction bids

Open bids as of Oct 22, 2026

City of Torrance is a public agency in California. This page lists its open construction bids with links to the official notices, the portal it posts on, and its award history from official bid tabulations where we hold them.

Open construction bids

1 open as of Oct 22, 2026. Each links to the official notice.

ProjectDeadlineWork type
Residential and Arterial Pavement Improvement, I-159/I-139Nov 18, 2026Roadwork

Award history

The newest tabulated projects (newest letting Mar 27, 2026). Low bid is the apparent low bid on the tabulation; award status is not in this data. Bidder names are not shown.

ProjectLettingBiddersLow bidTabulation
City-Wide Elevator Maintenance and Repair ServicesJan 22, 20265$12,385Official tabulation
SIDEWALK IMPROVEMENTS FOR DISABLED ACCESSIBILITY, I-135 (FY25-26)Oct 29, 20257$784,841Official tabulation
Bid for the Renovation of the Emergency Operation Center at Fire Station 1Sep 30, 20258$298,300Official tabulation
Bid to Furnish Asphalt Concrete, Mixes and SS-1h EmulsionSep 26, 20253$758,935Official tabulation
MISCELLANEOUS WATER MAIN REPLACEMENTS, I-153 (VISTA LARGO EMERGENCY WATER MAIN REPAIRS) B2025-06Aug 6, 20258$289,700Official tabulation
Charles H. Wilson Park Storage Building DemolitionMay 1, 20257$332,370Official tabulation
Construction Inspection for the Beach Cities Green Streets Project S-194Mar 6, 20254$368,328Official tabulation
SIDEWALK IMPROVEMENTS FOR DISABLED ACCESSIBILITY, I-135 (FY24-25)Dec 4, 20247$808,235Official tabulation
Water Service Repair PartsMay 16, 20243$756,521Official tabulation
RESURFACING OF RAILROAD BRIDGE CROSSING OVER CRENSHAW BRIDGE, SOUTH OF DOMINGUEZ ST (RE-BID)Dec 12, 20234$121,750Official tabulation

Typical work types

Counted across its bids in the last 90 days.

  • Roadwork (1)

Bidders per project

Projects with bid tabs
11
Average bidders
5.2
Median bidders
5
Single-bid rate
9.1%