City of San Diego construction bids
Open bids as of Nov 15, 2026
City of San Diego is a public agency in California. This page lists its open construction bids with links to the official notices, the portal it posts on, and its award history from official bid tabulations where we hold them.
Open construction bids
3 open as of Nov 15, 2026. Each links to the official notice.
| Project | Deadline | Work type |
|---|---|---|
| As-Needed Temporary Housing/Accommodations | Nov 20, 2026 | Water/Sewer |
| As Needed, Sand for Turf Maintenance at City of San Diego Golf Course(s) (REBID) | Nov 25, 2026 | Landscaping |
| Villa La Jolla Storm Drain System Lining | Jan 6, 2027 | Water/Sewer |
Award history
The newest tabulated projects (newest letting Mar 21, 2025). Low bid is the apparent low bid on the tabulation; award status is not in this data. Bidder names are not shown.
| Project | Letting | Bidders | Low bid | Tabulation |
|---|---|---|---|---|
| As-Needed Installation, Repair, and Rental of Fences, Gates, Nets and Barriers | Feb 7, 2024 | 4 | $768,668 | Official tabulation |
| Bulk Liquid Oxygen for Public Utilities Department, Water Production Division | Jun 1, 2023 | 1 | $725,000 | Official tabulation |
| Sidewalk Sanitation Services | Jan 13, 2023 | 2 | $14,017 | Official tabulation |
| Removal and Transport of Grit, Scum/Sludge, and Storm Water | Jul 8, 2022 | 3 | $2,642,740 | Official tabulation |
| Asphalt Concrete | May 24, 2022 | 1 | $3,787,434 | Official tabulation |
| Wastewater Pumping, Removal, and Disposal at Various City Locations | Jan 14, 2022 | 2 | $590,604 | Official tabulation |
| Wastewater Flow Monitoring Equipment, Software & Services REBID | Dec 28, 2021 | 3 | $2,780,054 | Official tabulation |
| Maintenance and Repair of Medium Voltage Switchgear | Dec 10, 2021 | 4 | $1,397,689 | Official tabulation |
| Temporary Traffic Control Plan on Gatchell Road near Point Loma Wastewater Treatment Plant (PLWTP) within Cabrillo National Monument Park | Dec 10, 2021 | 3 | $882,000 | Official tabulation |
| Pumping Service-Removal and Disposal of Wastewater, Sand, and Debris from Sand Trap Holding Tanks | Dec 1, 2021 | 3 | $144,036 | Official tabulation |
Typical work types
Counted across its bids in the last 90 days.
- Water/Sewer (2)
- Landscaping (1)
Bidders per project
- Projects with bid tabs
- 44
- Average bidders
- 3.8
- Median bidders
- 4
- Single-bid rate
- 13.6%