Skip to main content

City of Norwalk construction bids

Open bids as of Nov 15, 2026

City of Norwalk is a public agency in California. This page lists its open construction bids with links to the official notices, the portal it posts on, and its award history from official bid tabulations where we hold them.

Award history

The newest tabulated projects (newest letting Jun 18, 2026). Low bid is the apparent low bid on the tabulation; award status is not in this data. Bidder names are not shown.

ProjectLettingBiddersLow bidTabulation
PREVENTATIVE MAINTENANCE AND REPAIR SERVICES FOR HVAC UNITS CITYWIDEApr 20, 20266$42,700Official tabulation
Building Demolition CIP 7859Mar 19, 20269$2,492,000Official tabulation
1-605 Hotspots at Stuedebaker Road & Alondra Blvd. CIP 7195Mar 17, 20267$148,500Official tabulation
CITYWIDE SIDEWALK/CONCRETE REPAIR AND REPLACEMENTFeb 11, 202617$305,150Official tabulation
CDBG CONCRETE ADA IMPROVEMENTS 2026 CIP No. 7941Jan 15, 202610$486,950Official tabulation
Building Demolition CIP 7876Jan 15, 20268$203,336Official tabulation
Firestone Boulevard Bridge over San Gabriel River - Controller Cabinet RepairOct 9, 20251$23,333Official tabulation
Halloween Traffic Control - Seventy (70) Ten-foot Concrete K-railsOct 3, 20252$27,300Official tabulation
WATER MAIN AND AMI/AMR METER REPLACEMENT PROJECT AND LOCAL STREETS REHABILITATION PROGRAM ZONE 31 ASPHALT IMPROVEMENTSApr 14, 202510$3,194,304Official tabulation
CDBG Concrete ADA Improvements 2025 Project No. 7940Mar 17, 202510$489,780Official tabulation

Bidders per project

Projects with bid tabs
26
Average bidders
5.5
Median bidders
6
Single-bid rate
26.9%