City of Inglewood construction bids
Open bids as of Nov 15, 2026
City of Inglewood is a public agency in California. This page lists its open construction bids with links to the official notices, the portal it posts on, and its award history from official bid tabulations where we hold them.
Award history
The newest tabulated projects (newest letting Jan 14, 2026). Low bid is the apparent low bid on the tabulation; award status is not in this data. Bidder names are not shown.
| Project | Letting | Bidders | Low bid | Tabulation |
|---|---|---|---|---|
| Cleaning of the Heating, Ventilation, and Air Conditioning (HVAC) Systems | Jan 14, 2026 | 1 | $93,155 | Official tabulation |
| Supply and Delivery of Water Distribution System Materials | Dec 17, 2025 | 3 | $213,538 | Official tabulation |
| Renovation of the Inglewood Main Library and Innovation Center | Jul 17, 2025 | 5 | $39,063,518 | Official tabulation |
| Request for the Lease of a Pre-Fabricated Modular Building at the City Yard | Jul 2, 2025 | 1 | $303,438 | Official tabulation |
| Electrical Equipment and Power Supplies for Annual City Special Events | Mar 13, 2025 | 3 | $2,385 | Official tabulation |
| Indoor Air Quality (IAQ) Improvement: Retrofit and Replace Heating, Ventilation, and Air Conditioning (HVAC) Systems with Needle Point Bipolar Ionization (NPBI) | Sep 4, 2024 | 3 | $697,360 | Official tabulation |
| Chillers Overhaul and Removal and Replacement of the Central Plant Condensers and Chilled Water Pumps | Aug 15, 2024 | 5 | $301,111 | Official tabulation |
| Supply and Delivery of Water Distribution System Materials | Aug 7, 2024 | 4 | $317,974 | Official tabulation |
| Water Analysis Lab Testing | Mar 20, 2024 | 1 | $45,998 | Official tabulation |
| Two-Way Radio Equipment Repair and Maintenance Service | Oct 25, 2023 | 2 | $92,347 | Official tabulation |
Bidders per project
- Projects with bid tabs
- 20
- Average bidders
- 3.1
- Median bidders
- 2.5
- Single-bid rate
- 25.0%