City of Fresno construction bids
Open bids as of Nov 15, 2026
City of Fresno is a public agency in California. This page lists its open construction bids with links to the official notices, the portal it posts on, and its award history from official bid tabulations where we hold them.
Open construction bids
9 open as of Nov 15, 2026. Each links to the official notice.
| Project | Deadline | Work type |
|---|---|---|
| Pave More Now Package S-2.1: Bullard & Forkner Traffic Signal & Sidewalk Upgrades and Herndon EB Left-Turn Extension | Nov 17, 2026 | Roadwork |
| Wellhead Treatment Improvements at Pump Station 102A | Nov 17, 2026 | Water/Sewer |
| River West Fresno Eaton Trail Extension Phase 1 | Nov 20, 2026 | — |
| Chestnut Neighborhood Sidewalks | Dec 1, 2026 | Concrete |
| FAX Administration Building Parking Lot Shade Structure Rebid | Dec 1, 2026 | Sitework & Earthwork |
| REBID - Repairs and Rehabilitation of Structural Components at the Fresno-Clovis Regional Wastewater Reclamation Facility (RWRF) Headworks Building - Phase 2 | Dec 1, 2026 | Water/Sewer |
| Landscape Herbicide | Dec 1, 2026 | Landscaping |
| Job Order Contracting for General Building Construction and HVAC Construction | Dec 1, 2026 | Mechanical |
| NOTICE ONLY: Fiscal Year 2027 Project Opportunities with the Department of Public Utilities | Jul 1, 2027 | — |
Award history
The newest tabulated projects (newest letting May 19, 2026). Low bid is the apparent low bid on the tabulation; award status is not in this data. Bidder names are not shown.
| Project | Letting | Bidders | Low bid | Tabulation |
|---|---|---|---|---|
| Concrete and Paving Repairs at the Regional Wastewater Reclamation Facility | May 19, 2026 | 5 | $117,470 | Official tabulation |
| Emergency Power Generator B-Switchgear and Headworks at the Fresno-Clovis Regional Wastewater Reclamation Facility | May 5, 2026 | 2 | $3,135,000 | Official tabulation |
| Fresno Area Express Administration Building Parking Lot Shade Structure | Apr 28, 2026 | 6 | $187,500 | Official tabulation |
| Replacement of One Makeup Air Unit and Two Air Handling Units in the Headworks Building Fresno-Clovis Regional Wast Water Reclamation Facility | Apr 28, 2026 | 2 | $833,658 | Official tabulation |
| Drill New Water Production Well at Pump Station 290A | Apr 21, 2026 | 6 | $850,156 | Official tabulation |
| Fresno-Clovis Regional Wastewater Reclamation Facility (RWRF) Digester Stairs Support Modifications | Apr 7, 2026 | 3 | $84,148 | Official tabulation |
| Repairs and Rehabilitation of Structural Components at the Fresno-Clovis Regional Wastewater Reclamation Facility (RWRF) Headworks Building - Phase 2 | Mar 31, 2026 | 4 | $3,793,850 | Official tabulation |
| Midtown Trail Segment 3: Prefabricated Pedestrian Bridge | Mar 31, 2026 | 5 | $78,009 | Official tabulation |
| First Street Between Shields and Princeton Avenues Water Main Replacement | Mar 10, 2026 | 7 | $1,193,060 | Official tabulation |
| Rebid- RWRF Training Building Roof Abatement and Replacement | Mar 3, 2026 | 6 | $256,313 | Official tabulation |
Typical work types
Counted across its bids in the last 90 days.
- Water/Sewer (2)
- Concrete (1)
- Landscaping (1)
- Mechanical (1)
- Roadwork (1)
- Sitework & Earthwork (1)
Bidders per project
- Projects with bid tabs
- 24
- Average bidders
- 4.5
- Median bidders
- 4
- Single-bid rate
- 8.3%