Skip to main content

City of Big Bear Lake construction bids

Open bids as of Oct 22, 2026

City of Big Bear Lake is a public agency in California. This page lists its open construction bids with links to the official notices, the portal it posts on, and its award history from official bid tabulations where we hold them.

Award history

The newest tabulated projects (newest letting Aug 27, 2025). Low bid is the apparent low bid on the tabulation; award status is not in this data. Bidder names are not shown.

ProjectLettingBiddersLow bidTabulation
EMERGENCY GENERATOR REPLACEMENT AT SEWER LIFT STATIONS #1, #9, #10 PROJECTAug 27, 20251$208,000Official tabulation
2024 SANITARY SEWER CURED-IN-PLACE PIPE PROJECTAug 1, 20244$487,976Official tabulation
PAC Drainage projectAug 1, 20241$373,300Official tabulation
DEMOLITION OF BUILDING AT 42106 BIG BEAR BOULEVARD PROJECTOct 3, 20236$106,740Official tabulation
COTTAGE LANE SEWER LINE REPLACEMENT PROJECTAug 31, 20238$121,329Official tabulation
Sanitary Sewer Cured-in-Place Pipe ProjectMay 18, 20235$351,855Official tabulation
City Hall Roof Restoration ProjectMay 11, 20234$871,048Official tabulation
Demolition of Building at 40986 Big Bear BoulevardOct 27, 20225$22,222Official tabulation
Jaybird Lane Sewer Line Replacement ProjectMay 26, 20223$80,318Official tabulation
Sanitary Sewer Cured-in-Place Pipe Project (CIPP)Apr 14, 20226$149,323Official tabulation

Bidders per project

Projects with bid tabs
11
Average bidders
4.6
Median bidders
5
Single-bid rate
18.2%