Bid Win Rate Analyzer

Track wins, losses, and what separates the two.

Coming Soon

This calculator is currently under development. Check back shortly!

Unlock the full Estimator suite

AI-powered bid intelligence, proposal drafting, and risk analysis — free for 7 days.

Start 7-Day Free Trial

Bid Win Rate Analyzer for estimators and bid managers

Bid Win Rate Analyzer helps estimators and bid managers qualify opportunities and price early-stage scopes. Enter scope, schedule, location, and fit and get a bid-ready decision or range you can use immediately in your bid or project file.

Used by contractors across California, Texas, Florida, New York, and Illinois, with active users in Los Angeles, Houston, Dallas, Chicago, Phoenix, Atlanta, Seattle, and Denver.

Quick answer: what does this tool do?

Track wins, losses, and what separates the two.

How should I apply the results?

Use the results as a line item or scope checkpoint in your bid.

Is this suitable for public bids?

Yes. The inputs align with typical DOT, municipal, and federal bid requirements.

What keywords does this tool target?

bid win rate calculator, construction bid tracking tool, bid hit rate analyzer

The Bid Win Rate Analyzer gives fast, reliable results for estimators and bid managers to qualify opportunities and price early-stage scopes. Enter scope, schedule, location, and fitand get a bid-ready decision or range in minutes.

Similar tools

Other calculators contractors use alongside the Bid Win Rate Analyzer.

View all tools
Live Opportunity

Done estimating? We found 247 active bids matching Construction.

Stop manually searching. Let our AI find profitable General Construction contracts for you instantly.

Verified Gov Sources
Smart Matching