Skip to main content

Quantity Takeoff Sheet

Structured measurements from the plans, ready to plug into your estimate.

BiddingExcel Export18 Fields100% Free

Project Information

Takeoff Items

Auto-calculated

Notes

Go beyond templates — find live bids

Search thousands of verified public & government bid sources with a 7-day free trial.

Start Free Trial

Quantity Takeoff Sheet for estimators, project managers, and design-build contractors

A quantity takeoff template records plan measurements, trade scope, units, and waste factors so estimators can turn drawing quantities into material lists.

This template helps estimators, project managers, and design-build contractors perform organized plan takeoffs that feed directly into material lists and cost estimates. It includes 3 organized sections with 18 professional fields, plus 1 repeatable section for line items. Fill it out in your browser and export a branded PDF in seconds.

Key Data Points

  • Project fields capture project name, plan date, takeoff preparer, takeoff date, and checker.
  • Item fields capture sheet number, trade, plan reference, location, description, length, width, height, quantity, unit, and waste factor, with the total including waste.
  • Filled example: a 120 ft by 8 ft CMU wall on sheet A-201 is 960 sq ft. At 1.125 standard 8 by 16 in. blocks per sq ft that is 1,080 blocks, and a 5% waste factor makes 1,134.

What does this template include?

3 sections with 18 fields covering project information, takeoff items, notes. Repeatable rows for line items.

How do I export this template?

Fill in the fields online. Click "Export Filled PDF" for a branded document. Or download a blank version to print.

Is this template free?

Yes. 100% free with no account required. Use it as many times as needed for any project.

Who is this template for?

Built for estimators, project managers, and design-build contractors who need to perform organized plan takeoffs that feed directly into material lists and cost estimates.

How to Use the Quantity Takeoff Sheet

  1. 1Enter project name, plan date, and takeoff preparer.
  2. 2Specify the trade and sheet number for traceability.
  3. 3Add takeoff items with dimensions, plan references, and locations.
  4. 4Enter unit and waste factor. Totals calculate automatically.
  5. 5Export the completed takeoff as a spreadsheet.
Geographic coverage: Useful for U.S. estimating teams reviewing quantities for public works, commercial, and design-build bid packages.

Related templates

Other documents contractors use alongside the Quantity Takeoff Sheet.

View all templates

Complete your stack with public & government bids.

ConstructionBids.ai fills the public-procurement gap with official source links, matching, alerts, risk review, and bid-decision workflow.

7-day free trialCancel anytimeThousands of verified sources