Company Information
Project Information
Emergency Procedures
Hazard Assessment
Fall Protection Plan
PPE Requirements
Hazard Communication
Electrical Safety
Toolbox Talk Schedule
Disciplinary Policy
Acknowledgment
Go beyond templates — find live bids
Search thousands of verified public & government bid sources with a 7-day free trial.
OSHA Job Site Safety Plan for general contractors, safety managers, and subcontractors
A job site safety plan documents company contacts, project scope, emergency procedures, hazard assessment, fall protection, PPE, hazard communication, and conditional excavation or scaffolding procedures.
This template helps general contractors, safety managers, and subcontractors organize project safety procedures, hazards, emergency contacts, and required PPE before mobilization. It includes 13 organized sections with 64 professional fields. Fill it out in your browser and export a branded PDF in seconds.
Key Data Points
- Company fields capture safety officer, phone, email, and company contact information.
- Hazard assessment fields include fall, electrical, excavation, scaffolding, confined space, hot work, hazardous materials, crane, silica, lead paint, and asbestos indicators.
- Safety procedure sections cover emergency response, fall protection, PPE, hazard communication, electrical safety, excavation, and scaffolding.
What does this template include?
13 sections with 64 fields covering company information, project information, emergency procedures, hazard assessment, fall protection plan, ppe requirements, hazard communication, electrical safety, excavation & trenching, scaffolding, toolbox talk schedule, disciplinary policy, acknowledgment.
How do I export this template?
Fill in the fields online. Click "Export Filled PDF" for a branded document. Or download a blank version to print.
Is this template free?
Yes. 100% free with no account required. Use it as many times as needed for any project.
Who is this template for?
Built for general contractors, safety managers, and subcontractors who need to organize project safety procedures, hazards, emergency contacts, and required PPE before mobilization.
Related contractor resources
How to Use the OSHA Job Site Safety Plan
- 1Enter company and safety officer information.
- 2Fill in project details and scope of work.
- 3Check all applicable hazards in the hazard assessment section.
- 4Complete conditional sections for excavation and scaffolding if applicable.
- 5Have the safety officer sign and export the completed PDF.
Related templates
Other documents contractors use alongside the OSHA Job Site Safety Plan.
Toolbox Talk Sign-In Sheet
Record safety meeting topics, attendees, signatures, and follow-up items.
Use template
Bid Proposal Template
Submit professional, itemized bid proposals that win contracts.
Use template
Subcontractor Bid Form
Standardize sub bids with scope, pricing, and qualification fields.
Use template
