Back to Blog
City Guides

PlanetBids Corona: Complete City of Corona Procurement Portal Guide 2025

November 2, 2025
6 min read
PlanetBids Corona: Complete City of Corona Procurement Portal Guide 2025

Quick answer

The **City of Corona** is a thriving Inland Empire community with an annual procurement budget exceeding $50 million. Contractors and suppliers use...

Summary

The **City of Corona** is a thriving Inland Empire community with an annual procurement budget exceeding $50 million. Contractors and suppliers use...

The City of Corona is a thriving Inland Empire community with an annual procurement budget exceeding $50 million. Contractors and suppliers use PlanetBids Corona to access competitive bidding opportunities for construction, public works, and professional services projects.

About PlanetBids Corona

PlanetBids Corona is the official eProcurement portal for the City of Corona, featuring:

  • Construction and infrastructure projects
  • Public works contracts
  • Professional services RFPs
  • Vendor registration and compliance
  • Electronic bid submission
  • Contract award tracking

Like neighboring Riverside County, Ontario, and other agencies using PlanetBids such as San Diego, Anaheim, and Fresno, Corona requires separate vendor registration.

How to Access PlanetBids Corona

Direct Portal Access

URL: https://www.planetbids.com/portal/portal.cfm?CompanyID=29447

Alternative Access Methods:

  1. Visit coronaca.gov
  2. Navigate to "City Hall""Finance""Purchasing"
  3. Click "Bid Opportunities" or "Vendor Portal"
  4. You'll be redirected to PlanetBids Corona
  5. Use existing PlanetBids login or register as new vendor

Note: Corona PlanetBids accounts are separate from Riverside County, Ontario, Kern County, and other portals.

Vendor Registration Process

Step 1: Create Account

  1. Navigate to PlanetBids Corona portal
  2. Click "Register as New Vendor"
  3. Enter business email address
  4. Create secure password
  5. Verify email
  6. Complete vendor profile

Step 2: Business Information

Required Details:

  • Legal business name
  • DBA/Trade name (if applicable)
  • Physical business address
  • Mailing address
  • Federal EIN (Tax ID)
  • Business license number
  • Primary contact information

Business Classifications:

  • Business structure (Corp, LLC, etc.)
  • Small business status
  • DBE/MBE/WBE certifications

Step 3: Select Commodity Codes

Construction:

  • General building construction
  • Heavy civil engineering
  • Specialty trade contractors
  • Concrete and paving
  • Plumbing and HVAC
  • Electrical contracting

Professional Services:

  • Engineering services
  • Architectural design
  • Environmental consulting
  • Construction management
  • Surveying

Goods and Services:

  • Vehicles and equipment
  • Technology and software
  • Office supplies
  • Facility maintenance

Step 4: Upload Certifications

All Vendors:

  • Business license (Corona or California)
  • General liability insurance
  • W-9 tax form

Construction Contractors:

  • California Contractor's License
  • DIR registration
  • Bonding capacity letter
  • Workers' comp insurance

For detailed steps, see our PlanetBids login guide.

Understanding Corona Procurement Thresholds

Informal ($0 - $50,000)

  • Simplified process
  • 3 vendor quotes
  • May not be on PlanetBids

Formal Bidding ($50,001 - $175,000)

  • Posted on PlanetBids Corona
  • Sealed bid submission
  • Standard requirements

Major Projects (Over $175,000)

  • Full competitive process
  • Performance/payment bonds
  • Mandatory pre-bid meetings
  • Public bid opening

Types of Opportunities on PlanetBids Corona

Transportation and Streets

  • Street resurfacing
  • Pavement rehabilitation
  • Traffic signal installations
  • Sidewalk improvements
  • ADA compliance upgrades

Water and Sewer

  • Water main replacement
  • Sewer line rehabilitation
  • Storm drain improvements
  • Pump station upgrades

Parks and Recreation

  • Park renovations
  • Playground equipment
  • Athletic field improvements
  • Sports complex construction
  • Landscape and irrigation

Building and Facilities

  • City facility improvements
  • Fire station construction
  • HVAC systems
  • Electrical upgrades
  • Building renovations

Professional Services

  • Civil engineering
  • Architectural services
  • Environmental studies
  • Construction management

Key Features of PlanetBids Corona

Electronic Bid Submission

Submit bids online through the planetbids vendor portal.

Plan Holder Lists

View competitors who downloaded documents.

Automated Notifications

Receive alerts for new bids, addenda, and awards. Similar to Anaheim and Huntington Beach.

Award History

Research past contract awards.

Tips for Winning Corona Bids

1. Understand Local Requirements

Local Business Preference: City may provide preferences for Corona-based businesses.

Prevailing Wage: All public works over $1,000 require:

  • DIR registration
  • Prevailing wage payment
  • Certified payroll

2. Attend Pre-Bid Meetings

Benefits:

  • Site visits
  • Direct questions to city staff
  • Understanding requirements
  • Networking

3. Monitor Competition

  • 5-10 holders: Lower competition
  • 10-20 holders: Moderate
  • 20+ holders: Competitive

4. Submit Early

  • Submit 1-2 hours before deadline
  • Verify attachments
  • Check calculations

Comparing Corona to Inland Empire Agencies

| City/County | Annual Budget | Guide | |------------|--------------|-------| | Corona | $50M+ | This guide | | Riverside County | $300M+ | Riverside guide | | Ontario | $60M+ | Ontario guide |

Troubleshooting Common Issues

Can't Access Portal

Not Receiving Notifications

  • Check spam
  • Whitelist @planetbids.com
  • Verify commodity codes

Bid Submission Failed

  • Submit early
  • Check file sizes
  • Verify attachments

Account Issues

  • Use "Forgot Password"
  • Contact Corona Purchasing: (951) 736-2265
  • Contact PlanetBids: (888) 285-3675

Why ConstructionBids.ai

The Problem

Contractors face:

  • ❌ Separate accounts for each city
  • ❌ Multiple logins daily
  • ❌ Risk of missing deadlines

The Solution

ConstructionBids.ai provides:

Start free trial →

Recent Projects on PlanetBids Corona

2024-2025 Awards:

Transportation:

  • Street Resurfacing Program - $6.2M
  • Traffic Signal Upgrades - $2.1M

Infrastructure:

  • Water Main Replacement - $4.8M
  • Sewer Rehabilitation - $3.4M

Facilities:

  • Fire Station Renovation - $2.9M
  • Recreation Center - $3.7M

Corona Procurement Contact

City of Corona Purchasing Division 400 S. Vicentia Avenue Corona, CA 92882

Phone: (951) 736-2265 Email: purchasing@coronaca.gov Hours: Monday-Thursday: 7:30 AM - 5:30 PM

PlanetBids Support: Phone: (888) 285-3675

Additional Resources

PlanetBids Guides:

Inland Empire:

Other California:

FAQs

Is registration free?

Yes, vendor registration is free.

Do I need a Corona license?

Yes, City of Corona or California business license.

Can I use one account for all cities?

No, each requires separate registration. See login guide.

How competitive are bids?

Varies: specialized 8-15 bidders, standard 15-30.

Next Steps

1. Register: Complete PlanetBids Corona registration.

2. Expand: Register for Ontario, Riverside, San Diego.

3. Simplify: ConstructionBids.ai aggregates all agencies.

Search all agencies →

ConstructionBids.ai LogoConstructionBids.ai

AI-powered construction bid discovery platform. Find government and private opportunities from 2,000+ sources across all 50 states.

support@constructionbids.ai

Disclaimer: ConstructionBids.ai aggregates publicly available bid information from government sources. While we strive to provide accurate and up-to-date information, we do not guarantee the accuracy, completeness, or timeliness of any bid data. Users should verify all information with the original source before making business decisions. ConstructionBids.ai is not affiliated with any government agency.

Data Sources: Bid opportunities are sourced from federal, state, county, and municipal government portals including but not limited to SAM.gov, state procurement websites, and local government bid boards. All data remains the property of the respective government entities.

© 2026 ConstructionBids.ai. All rights reserved.
Made in the USAPrivacyTerms
PlanetBids Portals
PlanetBids Corona: Complete City of Corona Procurement Portal Guide 2025 | Construction Bidding Guide | ConstructionBids.ai