Structural Steel Contractor Bidding: Complete Fabrication and Erection Guide

December 16, 2025
11 min read
CBConstructionBids.ai Team
Structural Steel Contractor Bidding: Complete Fabrication and Erection Guide

Structural steel bidding involves complex takeoffs, fabrication estimates, and erection planning. This guide helps steel contractors win profitable commercial and industrial projects.

Understanding Steel Bid Documents

Structural Drawings

Key Drawing Types

  • S-series structural plans
  • Framing plans
  • Elevations and sections
  • Connection details
  • Miscellaneous steel details

Information to Extract

  • Member sizes and lengths
  • Connection types
  • Steel grades
  • Finish requirements
  • Embedded items

Specifications

Division 05 Sections

  • 05 05 00 - Common Work Results
  • 05 12 00 - Structural Steel Framing
  • 05 21 00 - Steel Joist Framing
  • 05 31 00 - Steel Decking
  • 05 50 00 - Metal Fabrications

Critical Details

  • AISC requirements
  • AWS welding standards
  • Steel grades
  • Finish and coating specs
  • QC requirements

Takeoff Methods

Tonnage Calculation

Member Categories

  • Columns
  • Beams and girders
  • Bracing
  • Purlins and girts
  • Miscellaneous steel

Calculation Process

  1. List all members by size
  2. Calculate lengths
  3. Apply section weights
  4. Sum by category
  5. Add connections (15-25%)

Connection Takeoff

Types

  • Bolted connections
  • Welded connections
  • Base plates
  • Shear tabs
  • Moment connections

Include

  • Bolts and nuts
  • Welds (inches of weld)
  • Plates and angles
  • Hardware

Related Items

Steel Deck

  • Square footage
  • Deck type and gauge
  • Attachments
  • Sidelaps and endlaps

Miscellaneous Steel

  • Stairs and railings
  • Ladders
  • Embed plates
  • Lintels
  • Loose steel items

Pricing Components

Material Costs

Raw Steel

  • Mill pricing
  • Service center pricing
  • Grade premiums
  • Market conditions

Current Factors

  • Import tariffs
  • Supply availability
  • Lead times
  • Price volatility

Fabrication Costs

Labor Components

  • Layout and cutting
  • Fitting and welding
  • Drilling and punching
  • Surface preparation
  • Shop painting

Cost Factors

  • Shop rate
  • Complexity factor
  • Piece count
  • QC requirements

Erection Costs

Field Labor

  • Crew composition
  • Productivity rates
  • Access conditions
  • Weather impact

Equipment

  • Crane rental
  • Rigging
  • Man lifts
  • Support equipment

Fabrication Considerations

Shop Capabilities

Equipment

  • Burning tables
  • Beam lines
  • Drill lines
  • Welding stations
  • Paint booth

Capacity

  • Throughput rate
  • Lead time
  • Quality certifications
  • Project size limits

Detailing

Scope

  • Connection design
  • Shop drawings
  • Erection drawings
  • Coordination

Costs

  • In-house vs. outsourced
  • Software licensing
  • Review cycles
  • Revision handling

Quality Control

Requirements

  • AISC certification
  • AWS qualifications
  • Inspection protocols
  • Documentation

Cost Impacts

  • QC personnel
  • Testing
  • Certifications
  • Documentation

Erection Planning

Sequence

Considerations

  • Building access
  • Crane positions
  • Connection sequence
  • Plumbing and alignment

Documentation

  • Erection plan
  • Crane picks
  • Safety plans
  • Quality plans

Equipment Selection

Crane Types

  • Mobile cranes
  • Tower cranes
  • Crawler cranes

Selection Factors

  • Reach requirements
  • Pick weights
  • Site conditions
  • Rental costs

Safety

Key Requirements

  • Fall protection
  • Steel erection standard
  • Rigging safety
  • Multi-employer coordination

Common Bidding Mistakes

Takeoff Errors

Frequently Missed

  • Connection material
  • Shims and packing
  • Temporary bracing
  • Touch-up paint
  • Anchor bolts

Fabrication Underestimation

Watch For

  • Complex connections
  • Heavy sections
  • Special grades
  • Coating requirements
  • QC level

Erection Underestimation

Common Issues

  • Site access limitations
  • Sequencing constraints
  • Weather days
  • Coordination delays

Special Steel Types

Heavy Industrial

Characteristics

  • Large member sizes
  • Complex connections
  • Heavy lifts
  • Specialized equipment

Pricing Factors

  • Shop equipment limits
  • Field equipment needs
  • Specialized labor
  • Extended schedules

Long-Span Structures

Applications

  • Sports venues
  • Convention centers
  • Aircraft hangars
  • Warehouses

Special Considerations

  • Truss fabrication
  • Field assembly
  • Specialized erection
  • Camber requirements

Architecturally Exposed Steel

Requirements

  • Premium finishes
  • Visible connections
  • Tight tolerances
  • Surface preparation

Cost Premiums

  • Material selection
  • Fabrication care
  • Special coatings
  • Installation precision

Coatings and Finishes

Shop Primer

Standard Finishes

  • Shop primer (standard)
  • High-performance primer
  • Galvanizing
  • Intumescent

Specification Details

  • Mil thickness
  • Manufacturer requirements
  • Surface preparation
  • Touch-up requirements

Special Coatings

Types

  • Fireproofing
  • Intumescent paint
  • Galvanizing
  • Powder coating

Cost Factors

  • Material costs
  • Application labor
  • Cure time
  • Handling requirements

Public Project Requirements

Prevailing Wage

Classifications

  • Ironworkers
  • Crane operators
  • Laborers
  • Welders

Compliance

  • Certified payroll
  • Apprenticeship
  • Fringe benefits

Buy America

Requirements

  • Domestic steel
  • Documentation
  • Certification
  • Price impacts

Bonding

Requirements

  • Performance bonds
  • Payment bonds
  • Bid bonds
  • Capacity considerations

Working With GCs

Coordination

Key Interfaces

  • Concrete embeds
  • MEP penetrations
  • Cladding connections
  • Fire protection

BIM Coordination

  • Model submission
  • Clash detection
  • Resolution
  • Documentation

Schedule

Critical Path Items

  • Shop drawing approval
  • Fabrication duration
  • Delivery sequence
  • Erection duration

Buffer Management

  • Weather contingency
  • Approval delays
  • Fabrication issues
  • Field conditions

Technology in Steel Estimating

Software Tools

Estimating

  • ProEst
  • HCSS
  • WinSteel
  • Steel Office

Detailing

  • Tekla Structures
  • SDS/2
  • Advance Steel
  • IDEA StatiCa

Digital Takeoff

Benefits

  • Faster measurement
  • Better accuracy
  • Automatic calculations
  • BIM integration

Conclusion

Successful structural steel bidding combines accurate takeoffs with realistic fabrication and erection estimates. Calculate tonnage carefully. Include all connection materials. Plan erection sequences. Account for quality requirements.

The steel contractors who win profitable work demonstrate both estimating accuracy and project execution capability.


ConstructionBids.ai helps structural steel contractors find commercial opportunities and track bid deadlines across multiple procurement platforms.

ConstructionBids.ai LogoConstructionBids.ai

AI-powered construction bid discovery platform. Find government and private opportunities from 2,000+ sources across all 50 states.

support@constructionbids.ai

Disclaimer: ConstructionBids.ai aggregates publicly available bid information from government sources. While we strive to provide accurate and up-to-date information, we do not guarantee the accuracy, completeness, or timeliness of any bid data. Users should verify all information with the original source before making business decisions. ConstructionBids.ai is not affiliated with any government agency.

Data Sources: Bid opportunities are sourced from federal, state, county, and municipal government portals including but not limited to SAM.gov, state procurement websites, and local government bid boards. All data remains the property of the respective government entities.

© 2025 ConstructionBids.ai. All rights reserved.
Made in the USAPrivacyTerms