Landscaping Contractor Bidding: Guide to Public and Commercial Projects

December 16, 2025
9 min read
CBConstructionBids.ai Team
Landscaping Contractor Bidding: Guide to Public and Commercial Projects

Landscape bidding combines site work, horticulture, and construction skills. This guide helps landscaping contractors win profitable public and commercial projects.

Understanding Landscape Bid Documents

Landscape Drawings

Key Plan Types

  • Landscape plans (L-series)
  • Planting plans
  • Irrigation plans
  • Grading plans
  • Detail sheets

Information to Extract

  • Plant schedules
  • Irrigation layouts
  • Hardscape areas
  • Grading requirements
  • Site amenities

Specifications

Division 32 Sections

  • 32 10 00 - Bases, Ballasts, and Paving
  • 32 30 00 - Site Improvements
  • 32 80 00 - Irrigation
  • 32 90 00 - Planting

Critical Details

  • Plant sizes and species
  • Soil amendment requirements
  • Irrigation system specs
  • Warranty requirements
  • Maintenance period

Takeoff Categories

Plant Material

Inventory List

  • Trees (by caliper/height)
  • Shrubs (by container size)
  • Groundcovers (by flat/count)
  • Perennials and ornamental grasses
  • Sod/seed areas

Include

  • Stakes and guy wires
  • Root barriers
  • Tree grates
  • Mulch quantities

Irrigation Systems

Components

  • Mainline piping
  • Lateral piping
  • Sprinkler heads
  • Drip emitters
  • Valves and controllers
  • Backflow preventers

Measurement

  • Pipe lengths by size
  • Head counts by type
  • Valve counts
  • Controller locations

Hardscape

Elements

  • Pavers and stone
  • Concrete flatwork
  • Retaining walls
  • Site furnishings
  • Fencing

Quantities

  • Square footage
  • Linear footage
  • Unit counts

Site Work

Scope Items

  • Demolition
  • Grading
  • Drainage
  • Soil preparation
  • Import/export material

Pricing Components

Plant Material

Cost Factors

  • Wholesale pricing
  • Availability
  • Delivery charges
  • Installation labor
  • Warranty replacement

Seasonal Considerations

  • Spring demand premium
  • Fall availability
  • Winter limitations
  • Growing season timing

Labor Estimates

Major Activities

  • Site preparation
  • Irrigation installation
  • Planting operations
  • Hardscape installation
  • Finish grading

Productivity Factors

  • Site access
  • Soil conditions
  • Weather windows
  • Crew experience
  • Equipment availability

Equipment

Common Equipment

  • Mini excavators
  • Skid steers
  • Trenchers
  • Dump trucks
  • Compaction equipment

Cost Allocation

  • Rental rates
  • Operator costs
  • Mobilization
  • Fuel

Common Bidding Mistakes

Plant Material Errors

Watch For

  • Availability issues
  • Size specification confusion
  • Species substitution rules
  • Warranty requirements

Verification

  • Confirm availability
  • Check lead times
  • Understand substitution process
  • Know warranty terms

Irrigation Miscalculations

Frequently Missed

  • Trenching in hardscape areas
  • Sleeving under paving
  • Connections to water source
  • Controller programming
  • Winterization

Labor Underestimation

Common Issues

  • Site access limitations
  • Utility conflicts
  • Weather delays
  • Coordination with other trades
  • Punch list work

Specialty Landscape Work

Sports Fields

Unique Requirements

  • Turf specifications
  • Drainage systems
  • Irrigation design
  • Surface tolerances

Pricing Factors

  • Premium materials
  • Strict tolerances
  • Testing requirements
  • Warranty provisions

Green Roofs

Components

  • Waterproofing interface
  • Drainage layers
  • Growing medium
  • Plant material
  • Irrigation

Special Considerations

  • Access and staging
  • Weight limitations
  • Wind exposure
  • Maintenance access

Xeriscaping

Elements

  • Drought-tolerant plants
  • Efficient irrigation
  • Mulch and rock
  • Permeable surfaces

Market Demand

  • Water restrictions
  • Sustainability goals
  • Maintenance reduction
  • Cost savings

Public Project Requirements

Prevailing Wage

Typical Classifications

  • Laborers
  • Operating engineers
  • Cement masons
  • Irrigation technicians

Compliance

  • Correct wage rates
  • Certified payroll
  • Fringe calculations

Bonding

Requirements

  • Bid bonds
  • Performance bonds
  • Payment bonds
  • Maintenance bonds

Licensing

Common Requirements

  • Contractor license
  • Landscape contractor specialty
  • Pesticide applicator
  • Irrigation certifications

Warranty and Maintenance

Plant Warranties

Typical Terms

  • One-year warranty common
  • Replacement vs. refund
  • Exclusions (vandalism, acts of God)
  • Maintenance requirements

Pricing Warranty

  • Historical replacement rates
  • Species risk factors
  • Site conditions
  • Maintenance quality

Maintenance Periods

Common Scope

  • 90-day establishment
  • One-year maintenance
  • Ongoing contracts

Pricing

  • Visit frequency
  • Scope of services
  • Material costs
  • Equipment needs

Competitive Positioning

Differentiation

Beyond Price

  • Design capability
  • Plant knowledge
  • Irrigation expertise
  • Maintenance quality
  • Warranty backing

Value Engineering

Options

  • Plant substitutions
  • Irrigation alternatives
  • Hardscape materials
  • Phasing options

Working With GCs

Coordination

Key Interfaces

  • Site grading
  • Underground utilities
  • Concrete work
  • Paving
  • Building completion

Communication

  • Schedule coordination
  • Access requirements
  • Protection needs
  • Punch list timing

Subcontract Terms

Review Carefully

  • Payment terms
  • Warranty requirements
  • Schedule provisions
  • Change order process

Technology in Landscape Bidding

Software Tools

Options

  • LandFX
  • PRO Landscape
  • DynaSCAPE
  • Aspire

Features

  • Plant databases
  • Takeoff tools
  • Irrigation design
  • Proposal generation

GPS and Drones

Applications

  • Site measurement
  • Progress documentation
  • Irrigation mapping
  • Maintenance tracking

Conclusion

Successful landscape bidding combines horticultural knowledge with construction estimating skills. Understand the plans and specs. Price plant material accurately. Include all irrigation components. Account for site conditions.

The landscape contractors who win profitable work demonstrate expertise in both plants and construction while delivering quality installations.


ConstructionBids.ai helps landscaping contractors discover public bid opportunities and track deadlines for parks, schools, and municipal projects.

ConstructionBids.ai LogoConstructionBids.ai

AI-powered construction bid discovery platform. Find government and private opportunities from 2,000+ sources across all 50 states.

support@constructionbids.ai

Disclaimer: ConstructionBids.ai aggregates publicly available bid information from government sources. While we strive to provide accurate and up-to-date information, we do not guarantee the accuracy, completeness, or timeliness of any bid data. Users should verify all information with the original source before making business decisions. ConstructionBids.ai is not affiliated with any government agency.

Data Sources: Bid opportunities are sourced from federal, state, county, and municipal government portals including but not limited to SAM.gov, state procurement websites, and local government bid boards. All data remains the property of the respective government entities.

© 2025 ConstructionBids.ai. All rights reserved.
Made in the USAPrivacyTerms