Commercial flooring bidding requires knowledge of multiple flooring systems, surface preparation, and installation techniques. This guide helps flooring contractors win profitable commercial projects.
Understanding Flooring Bid Documents
Architectural Drawings
Key Drawing Types
- Floor finish plans
- Room finish schedules
- Flooring details
- Transition details
- Pattern layouts
Information to Extract
- Flooring types by area
- Square footage
- Pattern requirements
- Transition locations
- Base specifications
Specifications
Division 09 Sections
- 09 60 00 - Flooring
- 09 62 00 - Specialty Flooring
- 09 63 00 - Masonry Flooring
- 09 64 00 - Wood Flooring
- 09 65 00 - Resilient Flooring
- 09 68 00 - Carpeting
Critical Details
- Manufacturer requirements
- Installation standards
- Warranty requirements
- Surface preparation
- Testing requirements
Flooring Types
Carpet and Carpet Tile
Products
- Broadloom carpet
- Carpet tile (modular)
- Carpet planks
- Indoor/outdoor
Considerations
- Pattern matching
- Seam locations
- Transition types
- Moisture testing
Resilient Flooring
Types
- LVT (Luxury Vinyl Tile)
- VCT (Vinyl Composition Tile)
- Sheet vinyl
- Rubber flooring
- Linoleum
Factors
- Substrate requirements
- Adhesive compatibility
- Pattern complexity
- Transition details
Ceramic and Porcelain Tile
Categories
- Wall tile
- Floor tile
- Porcelain pavers
- Natural stone
Installation Methods
- Thin-set mortar
- Epoxy mortar
- Self-leveling systems
- Crack isolation
Specialty Flooring
Types
- Epoxy and urethane
- Polished concrete
- Terrazzo
- Resinous flooring
Considerations
- Surface preparation
- Cure time
- Environmental conditions
- Performance requirements
Takeoff Methods
Area Measurement
Process
- Measure room dimensions
- Calculate gross area
- Adjust for patterns
- Add waste factor
Waste Factors
- Broadloom: 10-15%
- Carpet tile: 5-10%
- Hard tile: 8-12%
- LVT: 5-10%
Linear Measurements
Categories
- Wall base
- Transitions
- Edge strips
- Stair nosings
Accessories
Common Items
- Adhesives
- Grout
- Sealers
- Underlayments
- Moisture mitigation
Pricing Components
Materials
Cost Factors
- Material selection
- Pattern requirements
- Availability
- Delivery charges
Quote Management
- Multiple suppliers
- Lead time verification
- Price validity
- Volume discounts
Labor
Installation Categories
- Surface preparation
- Material installation
- Grouting/sealing
- Transitions and base
- Cleanup
Productivity Rates
- Carpet tile: 150-250 SF/day
- Broadloom: 200-300 SF/day
- Ceramic tile: 75-150 SF/day
- LVT: 200-300 SF/day
Surface Preparation
Activities
- Moisture testing
- Concrete repair
- Self-leveling
- Shot blasting
- Grinding
Cost Impact
- Can exceed flooring cost
- Critical scope item
- Often underestimated
- Specification requirements
Common Bidding Mistakes
Scope Gaps
Frequently Missed
- Moisture testing
- Floor preparation
- Transitions
- Base installation
- Protection of work
- Final cleaning
Labor Underestimation
Watch For
- Pattern complexity
- Multiple floor levels
- Occupied spaces
- Access limitations
- Punch list work
Specification Oversights
Check Carefully
- Moisture limits
- Preparation standards
- Installation methods
- Warranty requirements
- Testing protocols
Surface Preparation
Moisture Testing
Methods
- Calcium chloride (ASTM F1869)
- Relative humidity (ASTM F2170)
- Moisture meters
Requirements
- Pre-installation testing
- Documentation
- Mitigation if needed
- Warranty compliance
Concrete Repair
Common Issues
- Cracks
- Spalling
- Unevenness
- Contamination
Solutions
- Crack repair
- Self-leveling compounds
- Shot blasting
- Grinding
Moisture Mitigation
Systems
- Epoxy systems
- Cementitious coatings
- Moisture membranes
Cost Impact
- $2-5 per SF additional
- Critical specification item
- Warranty requirement
Warranty Considerations
Manufacturer Warranties
Requirements
- Certified installer
- Proper preparation
- Installation methods
- Documentation
Contractor Warranties
Typical Terms
- Workmanship warranty
- Duration
- Exclusions
- Service response
Risk Management
Strategies
- Pre-installation testing
- Documentation
- Insurance coverage
- Clear exclusions
Working With GCs
Coordination
Key Interfaces
- Concrete cure time
- MEP completion
- Painting schedule
- Millwork installation
Protection
- Traffic protection
- Damage responsibility
- Cleaning responsibility
Schedule
Critical Factors
- Access timing
- Lead times
- Cure times
- Multi-phase work
Public Project Requirements
Prevailing Wage
Classifications
- Floor layers
- Tile setters
- Carpet installers
- Laborers
Compliance
- Correct rates
- Certified payroll
- Fringe calculations
Documentation
Required Submittals
- Product data
- Samples
- Installer qualifications
- Test reports
Sustainability
Requirements
- Low VOC materials
- Recycled content
- Local materials
- LEED credits
Technology in Flooring Bidding
Estimating Software
Options
- Measure Square
- FloorWizard
- STACK
- PlanSwift
Features
- Digital takeoff
- Material databases
- Labor calculations
- Report generation
Digital Tools
Benefits
- Faster measurement
- Pattern visualization
- Waste optimization
- Documentation
Competitive Strategies
Differentiation
Beyond Price
- Quality installation
- Schedule reliability
- Warranty backing
- Problem solving
Value Engineering
Options
- Product alternatives
- Pattern simplification
- Installation methods
- Phasing options
Conclusion
Successful flooring bidding requires accurate takeoffs, proper surface preparation pricing, and comprehensive scope understanding. Measure carefully. Include all preparation costs. Understand specifications. Present professionally.
The flooring contractors who win profitable work combine estimating accuracy with quality installation and reliable execution.
ConstructionBids.ai helps flooring contractors find commercial opportunities and track bid deadlines for offices, schools, healthcare, and retail projects.