Fire protection bidding requires specialized knowledge of codes, system design, and compliance requirements. This guide helps fire sprinkler contractors win profitable commercial projects.
Understanding Fire Protection Documents
Fire Protection Drawings
Key Drawing Types
- FP-series fire protection plans
- Riser diagrams
- Detail sheets
- Reflected ceiling plans (for head locations)
- Architectural plans (for coverage areas)
Information to Extract
- System types
- Hazard classifications
- Head locations
- Pipe routing
- Equipment locations
Specifications
Division 21 Sections
- 21 05 00 - Common Work Results
- 21 10 00 - Water-Based Fire Suppression
- 21 13 00 - Fire Suppression Sprinkler Systems
- 21 20 00 - Fire Extinguishing Systems
- 21 30 00 - Fire Pumps
Critical Details
- Design criteria
- System types
- Piping materials
- Head specifications
- Approval requirements
Fire Sprinkler System Types
Wet Systems
Characteristics
- Pipes filled with water
- Fastest response
- Most common type
- Temperature limitations
Applications
- Office buildings
- Retail spaces
- Hotels
- Residential
Dry Systems
Characteristics
- Pipes filled with air
- Delays water delivery
- Requires air compressor
- Higher maintenance
Applications
- Unheated spaces
- Parking garages
- Cold storage
- Loading docks
Pre-Action Systems
Characteristics
- Dry until activated
- Detection required
- Two-trigger operation
- Reduced accidental discharge
Applications
- Data centers
- Museums
- Libraries
- Electronics manufacturing
Deluge Systems
Characteristics
- All heads open
- Detection triggered
- Rapid water delivery
- High water demand
Applications
- Aircraft hangars
- Chemical processing
- Power plants
- High-hazard areas
Takeoff Methods
Head Count
By System Type
- Wet heads
- Dry heads
- Concealed heads
- Special application heads
Include
- Escutcheons
- Guards
- Spare head cabinets
Pipe Takeoff
Measurement Approach
- Measure centerline lengths
- Separate by pipe size
- Include vertical risers
- Account for fittings
Pipe Types
- Black steel schedule 40
- CPVC (where permitted)
- Grooved vs. threaded
- Copper (residential)
Fittings and Hangers
Categories
- Tees and elbows
- Reducers
- Couplings
- Hangers and brackets
- Seismic bracing
Equipment
Major Items
- Fire pump assemblies
- Backflow preventers
- Alarm devices
- Control valves
- Air compressors (dry systems)
Pricing Components
Materials
Cost Factors
- Steel prices
- Head specifications
- Equipment quality
- Local availability
Quote Management
- Multiple suppliers
- Lead time verification
- Price validity
- Escalation clauses
Labor
Major Activities
- Pipe fabrication
- System installation
- Equipment setting
- Testing and commissioning
- Inspections
Productivity Factors
- Building access
- Ceiling heights
- Coordination requirements
- Work hours available
Design Costs
Design-Build Projects
- Hydraulic calculations
- Shop drawings
- Engineering review
- Approval process
Plans-and-Spec Projects
- Shop drawing preparation
- Coordination drawings
- As-built documentation
Code Compliance
NFPA Standards
Key Codes
- NFPA 13 - Sprinkler Systems
- NFPA 13R - Residential
- NFPA 13D - One/Two Family
- NFPA 14 - Standpipes
- NFPA 20 - Fire Pumps
- NFPA 25 - Inspection/Testing
Compliance Requirements
- Design calculations
- Material listings
- Installation methods
- Testing procedures
Local Requirements
Variations
- AHJ interpretations
- Local amendments
- Permit processes
- Inspection schedules
Pre-Bid Research
- Identify AHJ
- Understand requirements
- Budget for inspections
- Plan approval timeline
Common Bidding Mistakes
Scope Gaps
Frequently Missed
- Core drilling
- Fire stopping
- Signage
- Spare heads
- Standpipe connections
- Underground work
Design Errors
Watch For
- Hazard classification errors
- Coverage area miscalculations
- Hydraulic calculation issues
- Code interpretation differences
Labor Underestimation
Common Issues
- Access constraints
- Coordination delays
- Inspection failures
- Retrofit challenges
Specialty Systems
Special Hazards
System Types
- Clean agent systems
- Foam systems
- Water mist
- Kitchen hood systems
Pricing Factors
- Specialized materials
- Certification requirements
- Design complexity
- Maintenance requirements
High-Rise Buildings
Special Requirements
- Standpipe systems
- Fire pump sizing
- Zone considerations
- Pressurization
Cost Factors
- Material handling
- Premium labor
- Extended schedules
- Coordination complexity
Testing and Commissioning
Required Tests
Standard Tests
- Hydrostatic test
- Main drain test
- Alarm test
- Trip test (dry systems)
Documentation
- Test reports
- Inspection certificates
- As-built drawings
- O&M manuals
Approval Process
Steps
- Permit application
- Plan review
- Rough inspection
- Final inspection
- Certificate issuance
Timeline Considerations
- Review periods
- Inspection scheduling
- Correction time
- Re-inspection
Working With Other Trades
Coordination
Key Interfaces
- HVAC ductwork
- Electrical conduit
- Ceiling grids
- Structural elements
BIM Coordination
- Model submission
- Clash detection
- Resolution process
- Approval documentation
Schedule Impact
Dependencies
- Ceiling installation
- Drywall completion
- MEP coordination
- Final inspections
Public Project Requirements
Prevailing Wage
Classifications
- Sprinkler fitters
- Plumbers
- Laborers
Compliance
- Certified payroll
- Apprenticeship ratios
- Fringe benefits
Bonding and Insurance
Requirements
- Performance bonds
- Payment bonds
- Liability insurance
- Professional liability
Licensing
Typical Requirements
- Fire protection contractor license
- NICET certification
- Backflow certification
- State registrations
Technology in Fire Protection Bidding
Software Tools
Design Software
- AutoSPRINK
- HydraCAD
- SPRINKCAD
- Tyco SprinkFire
Estimating Software
- Custom databases
- Takeoff tools
- Labor libraries
BIM Applications
Benefits
- Design coordination
- Clash detection
- Quantity extraction
- Documentation
Conclusion
Successful fire protection bidding requires code knowledge, accurate takeoffs, and comprehensive scope understanding. Understand the system requirements. Count heads and measure pipe carefully. Include all testing and approval costs.
The fire protection contractors who win consistently combine technical expertise with reliable pricing and quality installation.