Bid Day Checklist: Essential Steps Before Submission

December 13, 2025
8 min read
CBConstructionBids.ai Team
Bid Day Checklist: Essential Steps Before Submission

Bid day is the culmination of days or weeks of estimating work. The pressure is intense, deadlines are firm, and small mistakes can disqualify an otherwise winning bid. This checklist helps ensure nothing falls through the cracks when it matters most.

The Week Before Bid Day

Document Review

Verify you have current documents:

  • [ ] Latest drawings (check revision dates)
  • [ ] Current specifications
  • [ ] All issued addenda acknowledged
  • [ ] Bid form is current version
  • [ ] Contract documents reviewed

Confirm bid requirements:

  • [ ] Submission deadline and location
  • [ ] Required forms and format
  • [ ] Number of copies needed
  • [ ] Electronic vs. paper submission
  • [ ] Bid security requirements

Subcontractor Coordination

Reach out to subs:

  • [ ] Confirm expected bid coverage
  • [ ] Remind of your deadline (before bid time)
  • [ ] Clarify scope divisions
  • [ ] Request final pricing commitment
  • [ ] Identify backup options

Track sub bid status:

| Trade | Primary Sub | Backup | Status | |-------|-------------|--------|--------| | Electrical | ABC Electric | XYZ Power | Expected | | Mechanical | Quick HVAC | Air Pros | Received | | Plumbing | Pro Plumb | Pipe Works | Expected |

Estimate Review

Final estimate check:

  • [ ] All scope items included
  • [ ] Quantities verified
  • [ ] Labor rates current
  • [ ] Material prices confirmed
  • [ ] Equipment costs included
  • [ ] Overhead and profit applied

Day Before Bid Day

Administrative Preparation

Prepare bid documents:

  • [ ] Bid form filled out (except price)
  • [ ] Required certifications completed
  • [ ] Subcontractor list prepared (if required)
  • [ ] Non-collusion affidavit ready
  • [ ] Insurance certificates available
  • [ ] License information verified

Bid bond (if required):

  • [ ] Surety notified of bid
  • [ ] Bond amount confirmed
  • [ ] Bond form approved
  • [ ] Original will be available for submission

Prepare submission materials:

  • [ ] Envelopes/packaging ready
  • [ ] Labels prepared
  • [ ] Return address correct
  • [ ] Copies made as required

Logistics Planning

Confirm submission method:

For physical delivery:

  • [ ] Delivery location confirmed
  • [ ] Building access requirements known
  • [ ] Parking identified
  • [ ] Travel time estimated (with buffer)
  • [ ] Messenger/delivery person assigned

For electronic submission:

  • [ ] Portal login credentials tested
  • [ ] Upload process understood
  • [ ] File format requirements confirmed
  • [ ] Internet connection reliable
  • [ ] Backup submission method identified

Team Coordination

Assign bid day roles:

  • [ ] Estimator finalizing numbers
  • [ ] Person receiving sub bids
  • [ ] Person checking documents
  • [ ] Person handling delivery
  • [ ] Backup personnel identified

Communication plan:

  • [ ] Contact numbers exchanged
  • [ ] Check-in times established
  • [ ] Problem escalation path clear

Bid Day Morning

Early Start

Begin well before deadline:

  • [ ] All team members present
  • [ ] Workspace organized
  • [ ] Communication systems working
  • [ ] Bid documents laid out

Monitor communications:

  • [ ] Check email for addenda
  • [ ] Check agency website for updates
  • [ ] Phone lines open for subs
  • [ ] Fax machine working (if used)

Subcontractor Bids

Receiving sub bids:

  • [ ] Log all incoming bids
  • [ ] Note time received
  • [ ] Verify scope coverage
  • [ ] Check for qualifications/exclusions
  • [ ] Compare to estimate

Sub bid comparison worksheet:

| Trade | Sub Name | Amount | Scope Notes | Selected | |-------|----------|--------|-------------|----------| | Electrical | ABC | $145,000 | Complete | Yes | | Electrical | DEF | $152,000 | Complete | No | | Electrical | GHI | $138,000 | Missing fire alarm | No |

Watch for:

  • [ ] Last-minute better prices
  • [ ] Scope gaps between subs
  • [ ] Unusually low bids (verify scope)
  • [ ] Missing trade coverage

Final Number Assembly

Build your bid:

  • [ ] Enter selected sub bids
  • [ ] Add your direct work costs
  • [ ] Apply overhead and profit
  • [ ] Calculate total bid
  • [ ] Check math (multiple times)

Review checklist:

  • [ ] All trades covered
  • [ ] Self-performed work included
  • [ ] General conditions complete
  • [ ] Bonds and insurance included
  • [ ] Contingency considered
  • [ ] Final number makes sense

Final Hours Before Deadline

Document Assembly

Complete bid form:

  • [ ] Enter final bid amount
  • [ ] Write amount in words and numbers
  • [ ] Sign all required places
  • [ ] Date correctly
  • [ ] Check for blank fields

Attach required items:

  • [ ] Bid bond or security
  • [ ] Addenda acknowledgment
  • [ ] Subcontractor list
  • [ ] Required certifications
  • [ ] Any other required forms

Final document review:

  • [ ] All pages present
  • [ ] Correct number of copies
  • [ ] Signatures complete
  • [ ] No blank required fields
  • [ ] Package properly assembled

Quality Check

Have second person verify:

  • [ ] Bid amount correct
  • [ ] Math is accurate
  • [ ] All forms complete
  • [ ] Signatures present
  • [ ] Package contents correct

Common last-minute catches:

  • Transposed numbers
  • Wrong project name
  • Missing signature
  • Unsigned bond
  • Wrong date

Submission

For physical delivery:

  • [ ] Package sealed
  • [ ] Properly labeled
  • [ ] Delivered to correct location
  • [ ] Submitted before deadline
  • [ ] Receipt obtained

For electronic submission:

  • [ ] Files properly named
  • [ ] Correct format (PDF, etc.)
  • [ ] Upload completed
  • [ ] Confirmation received
  • [ ] Screenshot/record saved

Post-Submission

Immediate Actions

Document your bid:

  • [ ] Save copy of submitted bid
  • [ ] Record final sub selections
  • [ ] Note any qualifications made
  • [ ] File estimate backup

Notify team:

  • [ ] Confirm successful submission
  • [ ] Share bid amount (internal)
  • [ ] Thank sub bidders
  • [ ] Schedule follow-up

Bid Opening

If public opening:

  • [ ] Attend if possible
  • [ ] Record all bid amounts
  • [ ] Note apparent low bidder
  • [ ] Get official bid tabulation

If not attending:

  • [ ] Request bid results
  • [ ] Check agency website
  • [ ] Follow up for tabulation

Emergency Procedures

What If Things Go Wrong

Missing sub coverage:

  • Use budget/estimate number with contingency
  • Call backup subs immediately
  • Note as allowance if permitted
  • Consider self-performing if capable

Technical problems:

  • Have backup submission method ready
  • Contact agency immediately
  • Document all issues
  • Request extension if warranted

Transportation issues:

  • Leave extra early
  • Have backup delivery person
  • Know alternate routes
  • Electronic backup if possible

Late sub bids:

  • Have cutoff time for incorporation
  • Know your process for last-minute changes
  • Double-check all adjustments
  • Don't rush into errors

When to Walk Away

Consider withdrawing if:

  • Major scope coverage gap
  • Critical error discovered
  • Numbers don't make sense
  • Risk is too high

Bid Day Don'ts

Avoid These Mistakes

Don't:

  • Wait until the last minute to assemble
  • Ignore sub bid qualifications
  • Skip the math verification
  • Rush the final review
  • Miss the submission deadline
  • Submit incomplete documents
  • Forget the bid bond

Don't accept:

  • Sub bids with hidden exclusions
  • Unrealistic low numbers
  • Incomplete scope coverage
  • Verbal pricing without backup

Continuous Improvement

Post-Bid Review

After every bid:

  • [ ] Compare your price to competition
  • [ ] Analyze where you were high/low
  • [ ] Review sub selection decisions
  • [ ] Identify process improvements
  • [ ] Update cost database

Refine Your Process

  • Document what worked
  • Fix what didn't
  • Train team members
  • Update checklists
  • Improve for next time

Conclusion

Bid day success comes from preparation and process. This checklist helps ensure that when the deadline arrives, your bid is:

  • Complete with all required documents
  • Accurate in pricing and math
  • Compliant with all requirements
  • Delivered on time

Create your own customized checklist based on your company's process and the specific requirements you commonly encounter. Review and update it regularly. A solid bid day routine reduces stress, prevents errors, and gives you the best chance of winning profitable work.


ConstructionBids.ai provides clear deadline information and bid requirements upfront, helping you prepare and plan for successful bid day execution.

ConstructionBids.ai LogoConstructionBids.ai

AI-powered construction bid discovery platform. Find government and private opportunities from 2,000+ sources across all 50 states.

support@constructionbids.ai

Disclaimer: ConstructionBids.ai aggregates publicly available bid information from government sources. While we strive to provide accurate and up-to-date information, we do not guarantee the accuracy, completeness, or timeliness of any bid data. Users should verify all information with the original source before making business decisions. ConstructionBids.ai is not affiliated with any government agency.

Data Sources: Bid opportunities are sourced from federal, state, county, and municipal government portals including but not limited to SAM.gov, state procurement websites, and local government bid boards. All data remains the property of the respective government entities.

© 2025 ConstructionBids.ai. All rights reserved.
Made in the USAPrivacyTerms