Skip to main content

CSI MasterFormat Lookup

Search by division number, keyword, or trade name to find matching CSI MasterFormat sections.

The CSI MasterFormat Lookup tool lets subcontractors search construction specification divisions and sections by number, keyword, or trade name. MasterFormat is the industry standard for organizing construction specs and bid documents, with 50 divisions covering all construction work.

Search MasterFormat Divisions

Search by division number, section title, or trade name (e.g., “plumbing”, “03 30”, “electrical”).

Enter a division number, spec section title, or trade alias

Type a trade, division number, or keyword above to search all 37 MasterFormat divisions.

All MasterFormat Divisions

00Procurement and Contracting Requirements
01General Requirements
02Existing Conditions
03Concrete
04Masonry
05Metals
06Wood, Plastics, and Composites
07Thermal and Moisture Protection
08Openings
09Finishes
10Specialties
11Equipment
12Furnishings
13Special Construction
14Conveying Equipment
21Fire Suppression
22Plumbing
23Heating, Ventilating, and Air Conditioning (HVAC)
25Integrated Automation
26Electrical
27Communications
28Electronic Safety and Security
31Earthwork
32Exterior Improvements
33Utilities
34Transportation
35Waterway and Marine Construction
40Process Integration
41Material Processing and Handling Equipment
42Process Heating, Cooling, and Drying Equipment
43Process Gas and Liquid Handling, Purification, and Storage Equipment
44Pollution Control Equipment
45Industry-Specific Manufacturing Equipment
46Water and Wastewater Equipment
47Electrical Power Generation
48Electronic Detection and Monitoring Equipment
49Reserved for Future Expansion

Example

An electrical subcontractor wants to find all CSI sections related to their trade when reviewing a bid package.

Search query"electrical"
Matched divisionsDivision 16 / 26 (Electrical)
Key sections found26 05 00 Common Work Results, 26 20 00 Distribution, 26 51 00 Lighting
Trade tagselectrician, electrical, low-voltage
Scope mappingDivision 26 — Electrical

How to Use This Tool

  1. 1Type a CSI division number (e.g., "03"), keyword (e.g., "concrete"), or trade name (e.g., "electrical").
  2. 2Browse the filtered results showing division numbers, section titles, and trade mappings.
  3. 3Click any section to see its sub-sections and common scope items.

How to Apply the Results

Use the matched divisions to set up trade filters in bid search, identify which spec sections apply to your scope, and communicate clearly with GCs about what work you cover.

Frequently Asked Questions

Map chosen trades into Sub-Hub automatically

AI-powered bid matching for specialty subcontractors — by trade, service area, and certification.

Start 7-Day Trial