Construction QR Code Generator
Link drawings, specs, and safety docs to the field.
Coming Soon
This calculator is currently under development. Check back shortly!
Unlock the full Estimator suite
AI-powered bid intelligence, proposal drafting, and risk analysis — free for 7 days.
Construction QR Code Generator for estimators and supers
Construction QR Code Generator helps estimators and supers avoid manual conversion errors. Enter unit conversions and common quantities and get clean conversions for takeoffs you can use immediately in your bid or project file.
Used by contractors across California, Texas, Florida, New York, and Illinois, with active users in Los Angeles, Houston, Dallas, Chicago, Phoenix, Atlanta, Seattle, and Denver.
Quick answer: what does this tool do?
Link drawings, specs, and safety docs to the field.
How should I apply the results?
Use the results as a line item or scope checkpoint in your bid.
Is this suitable for public bids?
Yes. The inputs align with typical DOT, municipal, and federal bid requirements.
What keywords does this tool target?
construction QR code generator, jobsite QR labels, QR code for blueprints
Similar tools
Other calculators contractors use alongside the Construction QR Code Generator.