Excavation Calculator
Account for swell, shrinkage, and haul-off.
Excavation Dimensions
Clay ~25%, Sand ~12%
Volume & Haul-off
Bank Volume
Cubic Yards (In Place)
Loose Volume
Cubic Yards (After Digging)
Logistics
Truck Loads Needed
0 loads
Excavation Calculator for earthwork contractors
Excavation Calculator helps earthwork contractors price earthwork accurately. Enter cut and fill dimensions and swell factors and get excavation volumes you can use immediately in your bid or project file.
Used by contractors across California, Texas, Florida, New York, and Illinois, with active users in Los Angeles, Houston, Dallas, Chicago, Phoenix, Atlanta, Seattle, and Denver.
Quick answer: what does this tool do?
Calculate cut and fill volumes with swell and shrink factors.
How should I apply the results?
Use volumes for hauling and disposal estimates.
Is this suitable for public bids?
Yes. The inputs align with typical DOT, municipal, and federal bid requirements.
What keywords does this tool target?
excavation calculator, dirt removal calculator
Related tools
More trade tools used by contractors like you.
Box Fill Calculator (NEC)
Quickly verify conductor count against box volume limits.
Metal Stud Calculator
Size studs, track, and screws for commercial partitions.
Rebar Spacing + Slab Reinforcement Calculator
Compute bar count, lap, and steel weight for slabs.
Conduit Fill Calculator (NEC)
Code-compliant wire fills, instantly.
Voltage Drop Calculator
Ensure NEC compliance for long runs.
HVAC Duct Sizing Calculator
Size ducts for proper airflow and velocity.