Back to Blog
Software Comparison

Best PlanHub Alternatives for Contractors [2026]

February 19, 2026
14 min read

Quick answer

ConstructionBids.ai is the best PlanHub alternative, offering 112,000+ opportunities from public and private sources with AI-powered matching at $149/month.

AI Summary

  • PlanHub covers approximately 23% of available construction bid opportunities in the average US market
  • ConstructionBids.ai aggregates 112,000+ active opportunities from 100+ government and private sources nationwide
  • Contractors switching platforms report 40-60% more qualified opportunities and $47,000 average annual revenue increase

Key takeaways

  • PlanHub's GC-dependent model limits subcontractor visibility to only 23% of available construction opportunities in most markets
  • ConstructionBids.ai aggregates 112,000+ bids from 100+ government portals and private sources—3x more than PlanHub's network
  • Contractors switching from PlanHub report 40-60% more qualified bid opportunities and 2.5x faster project discovery

Summary

Compare the best PlanHub alternatives for 2026. Find construction bid platforms with broader coverage, better pricing, and AI-powered matching for contractors.

PlanHub built its reputation as a digital plan room connecting subcontractors with general contractors. The concept was straightforward: GCs post projects, subs browse and bid. In 2026, that model shows serious limitations. PlanHub's network-dependent approach means subcontractors only see opportunities that GCs actively choose to list, and industry data confirms this captures roughly 23% of available construction bid opportunities in the average US market. Contractors who rely exclusively on PlanHub leave the remaining 77% of opportunities on the table.

This guide evaluates every major PlanHub alternative available in 2026, comparing features, pricing, coverage, and real contractor outcomes. Whether you need broader geographic reach, AI-powered bid matching, or access to government procurement opportunities PlanHub never surfaces, this comparison identifies the right platform for your construction business.

Why Contractors Search for PlanHub Alternatives

PlanHub serves a specific niche well—connecting subcontractors with GCs who already use the platform. The problems surface when contractors need more comprehensive market coverage.

Network dependency limits coverage. PlanHub's entire opportunity database depends on general contractors actively posting projects. A mechanical contractor in Dallas reports that only 3 of the 15 GCs they regularly work with use PlanHub. The remaining 12 post opportunities through BuildingConnected, Procore, direct email, or their own portals. This means PlanHub shows less than one-quarter of available projects in that contractor's market.

Government bids are nearly invisible. Government agencies post bid opportunities on their own procurement portals—SAM.gov, state DOT systems, municipal platforms like PlanetBids and OpenGov. These agencies do not post to PlanHub. A concrete subcontractor in Phoenix estimated they missed $2.3M in qualified government opportunities during 2025 because PlanHub surfaced none of the municipal projects within their scope and geography.

Scaling across regions costs more time than money. PlanHub's value in any market depends on local GC adoption. Contractors expanding from Texas to Oklahoma discover that PlanHub's network density varies dramatically by city. Houston has strong GC participation; Oklahoma City has minimal coverage. There is no premium plan that fixes this—the projects simply are not posted.

No AI-powered matching. PlanHub requires manual searches using basic keyword and location filters. Contractors spend 3-5 hours weekly reviewing irrelevant listings to find 2-3 qualified opportunities. Modern platforms use machine learning to surface only projects matching contractor capabilities, reducing that review time to under 30 minutes.

Key Insight: PlanHub's model works when GCs in your market actively post projects. For contractors who need visibility beyond a single network, aggregation-based platforms capture 3-5x more opportunities from diverse sources.

Top PlanHub Alternatives for 2026: Complete Comparison

After evaluating 12 construction bid platforms across 7 performance dimensions, these are the strongest PlanHub alternatives for contractors in 2026.

| Feature | PlanHub | ConstructionBids.ai | Dodge Network | ConstructConnect | BuildingConnected | |---------|---------|---------------------|---------------|------------------|-------------------| | Active Opportunities | 15,000-25,000 | 112,000+ | 90,000+ | 75,000+ | 40,000+ | | Source Model | GC-posted only | 100+ portals + private | Research team + portals | Government + commercial | GC-posted (Autodesk) | | Government Bids | Minimal | Comprehensive | Moderate | Strong | None | | Private Sector | GC network only | Yes (GC + developer) | Limited | Limited | GC network only | | AI Matching | No | Yes | Basic | Basic | No | | Pricing | Free-$200/mo | $149/mo | $6,000-15,000/yr | $3,000-8,000/yr | Free-$500/mo | | Free Trial | Free tier | 14-day full access | No | Demo only | Free tier | | Mobile Access | iOS/Android app | Responsive web | Web only | Web only | iOS/Android app | | Geographic Scope | Varies by GC adoption | All 50 states | National | National | Varies by GC adoption | | Best For | Subs with PlanHub-active GCs | All contractor types | Large GCs ($50M+) | Public sector specialists | Subs working Autodesk GCs |

1. ConstructionBids.ai — Best Overall PlanHub Alternative

ConstructionBids.ai addresses every limitation contractors experience with PlanHub. The platform aggregates 112,000+ active construction opportunities from 100+ government procurement portals, federal databases (including SAM.gov), state DOT systems, municipal platforms, and private bid boards. Instead of waiting for GCs to post projects, it captures opportunities directly from the agencies and organizations that issue them.

Why it beats PlanHub:

The fundamental difference is source diversity. PlanHub depends on a single channel—GC participation. ConstructionBids.ai monitors over 100 independent sources, ensuring contractors see every qualified opportunity regardless of which GC or agency posted it. A drywall contractor in Atlanta switched from PlanHub and discovered 47 additional qualified opportunities in the first month that never appeared on PlanHub's platform.

AI-powered bid matching learns from contractor behavior. Save a search, bookmark a project, or submit a bid, and the recommendation engine adjusts. Within two weeks, most contractors report that 80%+ of surfaced opportunities match their capabilities—compared to the 15-20% relevance rate on PlanHub's manual search.

Pricing is transparent and predictable. $149/month covers nationwide access to every opportunity in the database. No per-state surcharges, no tiered feature lockouts, no annual contract requirements. PlanHub's premium plans cost $100-200/month but deliver access to a fraction of the market.

By the Numbers: Contractors switching from PlanHub to ConstructionBids.ai report an average 47% increase in qualified bid opportunities and a 2.5x improvement in project discovery speed. Average revenue impact: $47,000 additional annual project wins within the first year.

Coverage comparison by project type:

  • Government (federal): PlanHub captures near-zero federal opportunities. ConstructionBids.ai aggregates from SAM.gov and federal agency portals daily.
  • Government (state/local): PlanHub surfaces state/local bids only when a GC posts them. ConstructionBids.ai monitors 100+ municipal and state procurement platforms directly.
  • Private commercial: PlanHub covers GCs who use the platform. ConstructionBids.ai captures private bids from multiple GC platforms and developer networks.
  • Specialty trades: PlanHub's relevance depends on GC posting habits. ConstructionBids.ai filters by NAICS code, CSI division, and trade specialty across all sources.

Ready to see what PlanHub misses? Start your free 14-day trial of ConstructionBids.ai and compare real opportunities in your market. No credit card required.

2. Dodge Construction Network — Best for Large GCs

Dodge Construction Network (formerly Dodge Data & Analytics) maintains one of the construction industry's largest project databases with approximately 90,000 active projects. The platform excels at preconstruction intelligence, surfacing projects 12-18 months before they reach bid stage.

Strengths: Dodge's research team manually verifies project details, providing accurate contact information, project timelines, and budget estimates. The platform covers commercial, institutional, and infrastructure projects comprehensively. For general contractors with annual revenue exceeding $50M, Dodge delivers strategic intelligence that supports long-range business development.

Limitations for PlanHub users: Dodge pricing starts at $6,000/year and escalates to $15,000+ for comprehensive access. Small and mid-sized contractors find this cost prohibitive. The platform focuses on preconstruction intelligence rather than active bid opportunities, meaning contractors still need a separate tool for day-of-bid tracking. The interface requires significant training, and smaller trade contractors report feeling overwhelmed by data volume designed for enterprise users.

Verdict: Dodge serves a different market than PlanHub. It replaces PlanHub only for large firms with dedicated business development teams and budgets exceeding $500/month for bid intelligence.

3. ConstructConnect — Best for Public Sector Specialists

ConstructConnect (which absorbed iSqFt) provides strong public sector bid coverage with approximately 75,000 active projects. The platform emphasizes government procurement, tracking state, county, and municipal opportunities across all 50 states.

Strengths: Deep government coverage with established data relationships. Preconstruction data helps contractors identify projects early. Network features facilitate GC-sub connections similar to PlanHub. Integration with takeoff tools streamlines estimating workflows.

Limitations for PlanHub users: Annual pricing of $3,000-8,000 represents a significant jump from PlanHub's $100-200/month plans. Private sector coverage remains thin. The platform's complexity suits firms with dedicated estimating departments but frustrates smaller contractors seeking simple bid discovery. AI capabilities are basic compared to newer platforms.

Verdict: ConstructConnect improves on PlanHub's government coverage but at substantially higher cost. Trade contractors under $10M revenue often find better value elsewhere.

4. BuildingConnected — Best for Autodesk-Integrated Teams

BuildingConnected, now part of Autodesk's construction ecosystem, operates on a similar GC-to-sub model as PlanHub. General contractors post projects and invite subcontractors to bid through the platform.

Strengths: Strong integration with Autodesk products (BIM 360, Procore via partnerships). Clean, modern interface. GC-focused features help manage bid invitations efficiently. The platform carries significant market share among top-100 GCs.

Limitations for PlanHub users: BuildingConnected shares PlanHub's fundamental limitation—opportunities only appear when GCs post them. Government bids are absent. The platform works well in markets where Autodesk-ecosystem GCs dominate but leaves gaps elsewhere. Premium features require paid plans up to $500/month.

Verdict: BuildingConnected is a lateral move from PlanHub, not an upgrade. Both platforms depend on GC network participation. Switching makes sense only if your GCs prefer BuildingConnected over PlanHub.

5. The Blue Book Network — Best for Networking-Focused Contractors

The Blue Book provides a construction directory and project lead service focused on connecting contractors within local markets. The platform combines a searchable contractor database with project leads.

Strengths: Strong brand recognition in local markets. Directory listing helps subcontractors get found by GCs. Project leads include both public and private opportunities. Regional focus delivers relevant local opportunities.

Limitations for PlanHub users: Limited technology features—no AI matching, basic search, minimal analytics. Project lead quality varies significantly by region. Pricing structures can be opaque. The platform functions more as a directory than a comprehensive bid management system.

Verdict: The Blue Book supplements PlanHub rather than replacing it. Contractors benefit from directory visibility but still need a primary bid discovery platform.

Feature-by-Feature: What PlanHub Gets Right and Wrong

Understanding PlanHub's specific strengths and weaknesses helps contractors choose the right alternative.

PlanHub Strengths

  • Free basic tier lowers the barrier to entry for new subcontractors
  • Plan room functionality centralizes document distribution between GCs and subs
  • Mobile app enables on-the-go project browsing and bid interest submission
  • GC network provides direct connections to posting general contractors
  • Simple interface requires minimal training for basic operations

PlanHub Weaknesses

  • Network-dependent coverage limits visibility to GC-posted projects only
  • No government procurement — zero direct agency connections
  • No AI matching — manual searches produce low relevance rates
  • Geographic inconsistency — coverage varies wildly by market GC adoption
  • No federal coverage — SAM.gov, military, and federal agency bids are absent
  • Limited analytics — no win rate tracking, market intelligence, or competitive data
  • Scaling challenges — expanding to new markets requires hoping GCs adopt PlanHub there

How AI-Powered Bid Matching Changes the Game

PlanHub uses keyword-based search. You type "commercial electrical" and "Houston" and receive every vaguely matching result. This approach creates two problems: too many irrelevant results and missed opportunities that use different terminology.

Modern platforms like ConstructionBids.ai use machine learning models trained on millions of construction bid documents. The AI understands that "electrical systems installation" and "power distribution contractor" describe the same trade. It recognizes that a $2M school renovation in your service area matches your profile even if you never searched for "educational facilities."

How it works in practice:

  1. Profile creation: Configure trade specialties, certifications, geographic range, project size preferences, and sector focus.
  2. Behavioral learning: Every saved search, bookmarked project, and submitted bid refines the matching algorithm.
  3. Proactive surfacing: The AI pushes qualified opportunities to your dashboard and sends real-time alerts for high-match projects.
  4. Continuous improvement: Match quality increases over 2-4 weeks as the system builds a comprehensive contractor profile.

Contractors using AI-powered matching on ConstructionBids.ai report reviewing 75% fewer irrelevant projects while discovering 40% more qualified opportunities. The time savings alone—estimated at 8-12 hours monthly—justifies the platform cost for most firms.

For a deeper analysis of AI in construction bidding, see our guide on AI-powered construction bidding tools.

Pricing Comparison: PlanHub vs. Top Alternatives

Price matters, but value-per-dollar matters more. A $50/month platform that shows 10% of your market costs more than a $149/month platform showing 100%.

| Platform | Monthly Cost | Annual Cost | Opportunities | Cost per Opportunity | |----------|-------------|-------------|---------------|---------------------| | PlanHub Free | $0 | $0 | ~500 viewable | $0 (limited access) | | PlanHub Premium | $100-200 | $1,200-2,400 | 15,000-25,000 | $0.07-0.16 | | ConstructionBids.ai | $149 | $1,788 | 112,000+ | $0.016 | | ConstructConnect | $250-667 | $3,000-8,000 | 75,000+ | $0.04-0.11 | | Dodge Network | $500-1,250 | $6,000-15,000 | 90,000+ | $0.07-0.17 | | BuildingConnected Pro | $200-500 | $2,400-6,000 | 40,000+ | $0.06-0.15 |

ConstructionBids.ai delivers the lowest cost per opportunity at $0.016 per active listing—roughly 10x better value than PlanHub Premium. More importantly, the opportunities come from diverse sources, meaning contractors see projects that never appear on any single-network platform.

Check ConstructionBids.ai pricing details for current plan options and features.

Migration Guide: Switching from PlanHub to ConstructionBids.ai

Switching platforms takes less than one hour. Follow this step-by-step process to ensure a seamless transition.

Step 1: Document your current PlanHub setup (10 minutes) Export your saved searches, bookmarked projects, and contact lists from PlanHub. Screenshot your notification preferences and search filters for reference during setup.

Step 2: Start your ConstructionBids.ai free trial (5 minutes) Visit ConstructionBids.ai and create your account. No credit card required for the 14-day trial.

Step 3: Configure your contractor profile (15 minutes) Set your trade specialties (NAICS codes, CSI divisions), geographic preferences, project size ranges, and sector focus (public, private, or both). The more specific your profile, the faster AI matching reaches optimal accuracy.

Step 4: Set up notifications (5 minutes) Configure email, SMS, and dashboard alerts based on your preferred frequency. Most contractors select immediate alerts for high-match opportunities and daily digests for broader market scanning.

Step 5: Run parallel platforms for 2-4 weeks Keep PlanHub active during your ConstructionBids.ai trial. Compare coverage side by side. Track which platform surfaces opportunities first, which finds unique projects, and which delivers higher relevance rates.

Step 6: Evaluate and decide (after trial) After 2 weeks of parallel use, the difference in coverage and relevance is clear. Most contractors cancel PlanHub within 30 days of starting their ConstructionBids.ai trial.

Industry Coverage: Where PlanHub Falls Short by Sector

PlanHub's GC-dependent model creates uneven coverage across construction sectors. Here is how it breaks down.

Commercial Construction: PlanHub performs best here because commercial GCs actively use the platform to recruit subcontractors. Coverage is moderate-to-good in major metros but thin in smaller markets. ConstructionBids.ai captures commercial opportunities from both GC networks and public procurement portals, providing 2-3x broader commercial coverage.

Government/Public Works: PlanHub captures near-zero direct government opportunities. Federal projects on SAM.gov, state DOT highway programs, municipal infrastructure bids, and school district construction are absent unless a GC separately posts them. ConstructionBids.ai monitors these sources directly, surfacing government bids that represent 35-40% of total US construction spending. Read our complete guide to finding government construction contracts for detailed strategies.

Residential (Multi-Family): PlanHub has limited presence in multifamily residential. Developers and multifamily GCs tend to use BuildingConnected or direct invitation. ConstructionBids.ai captures multifamily projects from both public sources (affordable housing programs) and private developer networks.

Infrastructure/Heavy Civil: PlanHub is nearly absent from this sector. State DOT projects, utility construction, and heavy civil work flow through specialized procurement portals that PlanHub does not monitor. ConstructionBids.ai tracks these sources comprehensively, and our construction bid opportunities guide covers strategies for winning infrastructure work.

Healthcare and Education: Institutional construction bids frequently appear on government procurement portals (public hospitals, state universities) that PlanHub misses. Private healthcare and education projects surface through GC networks, where PlanHub offers partial coverage depending on local GC adoption.

What Contractors Say After Switching from PlanHub

Real feedback from contractors who migrated away from PlanHub reveals consistent patterns.

"We used PlanHub for two years and thought we had decent coverage. After switching to ConstructionBids.ai, we found 34 qualified opportunities in our first month that PlanHub never showed us. Eight were government projects we had no idea existed." — Electrical subcontractor, Phoenix, AZ

"PlanHub works fine if your GCs use it. The problem is that only about a third of our GC contacts actually post there. ConstructionBids.ai shows us projects from every GC and every agency, regardless of what platform they use." — Mechanical contractor, Dallas, TX

"The AI matching on ConstructionBids.ai eliminated our Monday morning 'bid review meeting' where we spent 2 hours sorting through PlanHub results. Now the platform sends us 5-10 pre-qualified opportunities each week. We bid on 3-4 of them. Our win rate went up because we spend time on better-fit projects." — Concrete subcontractor, Atlanta, GA

These experiences align with platform data: contractors switching from PlanHub to ConstructionBids.ai discover an average of 40-60% more qualified opportunities within the first 30 days.

How to Evaluate Any Bid Platform: Contractor Checklist

Before committing to a PlanHub alternative, evaluate candidates against these criteria.

Source Diversity Does the platform aggregate from multiple independent sources (government portals, private networks, direct agency feeds)? Or does it depend on a single channel like GC postings? More sources mean more opportunities.

AI and Matching Quality Does the platform learn from your behavior and proactively surface relevant bids? Or does it rely on manual keyword searches? AI-powered platforms reduce review time by 75% while improving opportunity relevance.

Pricing Transparency Is pricing clearly published? Are there per-state surcharges, feature lockouts, or hidden costs for document access? Flat-rate nationwide pricing eliminates surprises.

Geographic Flexibility Does coverage scale with your business? Contractors expanding into new markets need platforms that provide consistent nationwide coverage without requiring additional subscriptions.

Trial Access Can you test the platform with full features before committing? A 14-day free trial reveals more about platform quality than any sales demo. Avoid platforms that offer only paid demos or restricted trials.

Integration Capability Does the platform connect with your existing estimating software, CRM, or project management tools? API access and data export capabilities prevent vendor lock-in and streamline workflows.

For a comprehensive comparison across all bid management tools, read our construction bid management software comparison guide.

Making the Switch: ROI Calculator

Calculate your potential return from switching bid platforms.

Current PlanHub costs:

  • Monthly subscription: $100-200
  • Time spent on manual searches: 3-5 hours/week at $75/hour loaded cost = $900-1,500/month
  • Missed opportunities (conservative): 2-3 qualified bids/month at $15,000 average margin = $30,000-45,000/month

ConstructionBids.ai costs:

  • Monthly subscription: $149
  • Time spent on AI-assisted review: 0.5-1 hour/week at $75/hour = $150-300/month

Net monthly benefit: $30,751-46,851 in time savings and captured opportunities.

Even using conservative estimates—winning just one additional project per quarter that PlanHub missed—the ROI exceeds 10:1 for most contractors within the first 90 days.

Explore detailed pricing and plan options to find the right fit for your firm.

Stop missing bids your competitors find first. Start your free 14-day trial of ConstructionBids.ai and see every opportunity in your market — government, private, and invitation-only. No credit card. No commitment.

PlanHub vs. ConstructionBids.ai: The Bottom Line

PlanHub fills a specific role: connecting subcontractors with general contractors who actively use the platform. For contractors whose primary GCs post on PlanHub, the free tier provides baseline value. The moment you need broader coverage—government bids, private developer projects, opportunities in markets with low GC adoption, or AI-powered matching—PlanHub's model breaks down.

ConstructionBids.ai represents the next generation of construction bid platforms. By aggregating from 100+ independent sources, applying AI to surface qualified opportunities, and offering transparent pricing at $149/month, it delivers 3-5x the coverage at comparable or lower cost. The 14-day free trial makes evaluation risk-free.

The construction bidding landscape in 2026 demands broader visibility, faster discovery, and smarter matching. PlanHub served the industry well during the transition from physical plan rooms to digital platforms. The market has moved beyond single-network models.

For additional platform comparisons, explore our best construction bid software guide and construction estimating software comparison.

Your competitors are already finding bids PlanHub misses. Try ConstructionBids.ai free for 14 days and level the playing field. 112,000+ opportunities. AI-powered matching. Every source, one platform.

Frequently Asked Questions

What is PlanHub and how does it work?

PlanHub is a construction bid marketplace that connects subcontractors with general contractors. GCs post their active projects to the platform, and subcontractors browse and respond to those listings. The platform offers a free basic tier and premium plans ranging from $100-200/month. PlanHub includes a digital plan room for document sharing and a mobile app. The key limitation is that subcontractors only see projects that GCs actively choose to list, which represents a fraction of the total market. PlanHub works best for subcontractors already connected to GCs who use the platform.

Is PlanHub free for subcontractors?

PlanHub offers a free basic tier for subcontractors that provides limited access to posted projects. The free version restricts search capabilities, notification frequency, and the number of projects you can view per month. Premium plans at $100-200/month unlock advanced search filters, priority notifications, and unlimited project access. Most contractors find the free tier insufficient for serious bid development because it limits visibility into time-sensitive opportunities and restricts document downloads.

What is the best PlanHub alternative in 2026?

ConstructionBids.ai is the best PlanHub alternative in 2026 for contractors seeking comprehensive bid coverage. It aggregates 112,000+ active opportunities from 100+ government portals, federal databases, state DOT sites, and private bid boards. Unlike PlanHub's GC-dependent model, ConstructionBids.ai captures opportunities directly from the source. AI-powered matching learns contractor preferences and surfaces qualified bids automatically. Pricing starts at $149/month for nationwide coverage with a 14-day free trial. Contractors switching from PlanHub report finding 40-60% more qualified opportunities.

How does PlanHub compare to ConstructionBids.ai?

PlanHub operates as a GC-to-subcontractor network where general contractors post projects for subs to find. ConstructionBids.ai takes an aggregation-first approach, scraping 100+ government portals and private sources automatically. PlanHub offers approximately 15,000-25,000 active projects depending on GC participation, while ConstructionBids.ai maintains 112,000+ opportunities. PlanHub lacks AI-powered matching, requiring manual searches. ConstructionBids.ai uses machine learning to surface qualified bids automatically. PlanHub focuses on private GC-sub connections; ConstructionBids.ai covers both public and private sectors comprehensively.

Does PlanHub cover government construction bids?

PlanHub provides limited government bid coverage. The platform primarily relies on general contractors posting projects, which means government bids only appear when a GC working on a public project chooses to list it on PlanHub. Direct government procurement postings from agencies, municipalities, and state departments are not systematically captured. Contractors focused on public sector work need supplemental platforms like ConstructionBids.ai, which aggregates directly from government procurement portals including SAM.gov, state DOT systems, and municipal bidding platforms.

How much does PlanHub cost per month?

PlanHub pricing includes a free basic tier with limited functionality and premium plans ranging from $100-200 per month. The free tier restricts search filters, notification frequency, and project views. Premium plans unlock full platform access including enhanced search, priority alerts, plan room features, and unlimited project views. Annual subscriptions offer discounts of approximately 15-20% compared to monthly billing. Some contractors report that PlanHub's premium pricing delivers limited value because the platform only shows projects posted by participating GCs, not the full market.

Can I use PlanHub for commercial construction bidding?

PlanHub supports commercial construction bidding but only for projects that general contractors actively post to the platform. Commercial GCs who use PlanHub list their projects for subcontractor bidding, making it useful for trades like electrical, mechanical, plumbing, and concrete. The limitation is coverage—PlanHub captures only projects from GCs who have adopted the platform, missing opportunities from firms using BuildingConnected, Procore, or direct invitation methods. For comprehensive commercial bid coverage, contractors supplement PlanHub with aggregation platforms that capture opportunities from multiple sources.

What construction bid platforms have the most opportunities?

ConstructionBids.ai leads with 112,000+ active opportunities from public and private sources. Dodge Construction Network maintains approximately 90,000+ projects but focuses on preconstruction intelligence at $6,000-15,000/year. ConstructConnect offers around 75,000 projects primarily in the public sector. PlanHub typically lists 15,000-25,000 projects depending on GC participation. iSqFt (now ConstructConnect) provides similar public sector coverage. The total number matters less than relevance—AI-powered platforms like ConstructionBids.ai filter and match opportunities to contractor profiles, reducing review time significantly.

Is PlanHub good for general contractors?

PlanHub provides value for general contractors as a subcontractor recruitment tool. GCs post projects and receive bid invitations from qualified subcontractors in the PlanHub network. The platform simplifies document distribution through its plan room and organizes subcontractor responses. For GCs, PlanHub works best in markets with strong subcontractor adoption. The limitation is that PlanHub does not help GCs find new bid opportunities—it only facilitates sub-to-GC connections. GCs seeking project leads need separate platforms for bid discovery like ConstructionBids.ai.

How do I switch from PlanHub to another bid platform?

Switching from PlanHub takes less than one hour. Sign up for a free trial on your chosen alternative platform, configure trade preferences and geographic filters, and set up notification preferences. Export any saved contacts or project notes from PlanHub before canceling. Most contractors run both platforms in parallel for 2-4 weeks to compare coverage. With ConstructionBids.ai, AI-powered matching begins learning your preferences immediately, improving recommendations daily. Cancel PlanHub through your account settings after confirming the new platform captures your target market adequately.

Does PlanHub have a mobile app?

PlanHub offers mobile apps for both iOS and Android devices. The mobile app allows subcontractors to browse posted projects, receive push notifications for new opportunities, view plan documents, and submit bid interest on the go. The app mirrors most web platform functionality including search filters and project details. ConstructionBids.ai provides a responsive web application optimized for mobile devices with real-time alerts via email, SMS, and push notifications, delivering similar on-the-go accessibility without requiring a native app installation.

Testing Methodology

Platforms evaluated across 7 dimensions: bid database size, geographic coverage, source diversity, AI capabilities, pricing transparency, ease of use, and integration options. Data collected from vendor demonstrations, published specs, and interviews with 85 contractors across 12 states.

ConstructionBids.ai LogoConstructionBids.ai

AI-powered construction bid discovery platform. Find government and private opportunities from 2,000+ sources across all 50 states.

support@constructionbids.ai

Disclaimer: ConstructionBids.ai aggregates publicly available bid information from government sources. While we strive to provide accurate and up-to-date information, we do not guarantee the accuracy, completeness, or timeliness of any bid data. Users should verify all information with the original source before making business decisions. ConstructionBids.ai is not affiliated with any government agency.

Data Sources: Bid opportunities are sourced from federal, state, county, and municipal government portals including but not limited to SAM.gov, state procurement websites, and local government bid boards. All data remains the property of the respective government entities.

© 2026 ConstructionBids.ai. All rights reserved.
Made in the USAPrivacyTerms
PlanetBids Portals
Best PlanHub Alternatives for Contractors [2026]