Bidding Strategy

Low Bid vs Best Value Construction Procurement [2025 Comparison]

Compare low bid and best value procurement methods for construction projects. Learn the advantages, disadvantages, and when each method works best for contractors.

Michael Torres
January 15, 2025
13 min read

Introduction

The choice between low bid and best value procurement fundamentally shapes how construction contracts are awarded. Understanding these methods helps contractors develop appropriate strategies for each and compete more effectively in both environments.

This guide compares low bid and best value procurement methods, examining their advantages and disadvantages, when each is appropriate, and how contractors can succeed under each approach.

Quick Comparison

  • Low Bid: Award to lowest price from responsive, responsible bidder
  • Best Value: Award based on combination of price and qualifications
  • Key Difference: How much non-price factors influence selection

Low Bid Procurement

Low bid (also called low-price technically acceptable) awards contracts to the lowest-priced bidder who meets minimum requirements.

How Low Bid Works

  1. Owner issues invitation to bid with complete plans/specs
  2. Contractors submit sealed price bids
  3. Bids opened publicly at specified time
  4. Lowest bid verified for responsiveness and responsibility
  5. Contract awarded to lowest responsive, responsible bidder

Advantages of Low Bid

  • Transparency: Clear, objective selection criteria
  • Simplicity: Straightforward evaluation process
  • Competition: Drives competitive pricing
  • Speed: Faster evaluation and award
  • Fairness: All bidders know the rules
  • Legal Protection: Less susceptible to protests

Disadvantages of Low Bid

  • Price Focus: Ignores non-price factors
  • Quality Risk: May select less qualified contractor
  • Change Orders: Low bidders may seek change orders
  • Schedule Risk: May result in longer completion
  • Limited Innovation: Rewards building to minimum spec
  • Relationship: Adversarial dynamics possible

When Low Bid is Required

Many public entities are legally required to use low bid for construction:

  • Traditional state and local public works
  • Federal construction under certain thresholds
  • Projects where statutes mandate low bid
  • Well-defined scope with clear specifications

Best Value Procurement

Best value procurement considers both price and non-price factors to select the proposal offering the greatest overall value to the owner.

How Best Value Works

  1. Owner issues RFP with evaluation criteria and weights
  2. Contractors submit price and technical proposals
  3. Evaluation committee scores technical factors
  4. Price evaluated (may be scored or analyzed separately)
  5. Award based on best overall value to owner

Common Evaluation Factors

  • Price: Often 30-60% of total evaluation
  • Experience: Similar project history
  • Key Personnel: Team qualifications
  • Technical Approach: Project methodology
  • Schedule: Timeline and milestones
  • Past Performance: References and ratings
  • Safety: Safety record and programs
  • Small Business: Subcontracting plans

Advantages of Best Value

  • Quality Focus: Considers contractor qualifications
  • Risk Reduction: Selects capable contractors
  • Innovation: Rewards better approaches
  • Relationship: Sets collaborative tone
  • Outcomes: Often better project results
  • Flexibility: Can weight factors appropriately

Disadvantages of Best Value

  • Complexity: More complex evaluation process
  • Subjectivity: Some factors are subjective
  • Time: Longer evaluation periods
  • Cost: More expensive to administer
  • Protest Risk: More susceptible to challenges
  • Proposal Cost: Contractors invest more in proposals

When Best Value is Used

  • Complex projects where qualifications matter
  • Design-build and CM at Risk delivery
  • Federal contracts (authorized by FAR)
  • Private sector projects (no restrictions)
  • States that have authorized best value for construction

Side-by-Side Comparison

AspectLow BidBest Value
Selection BasisLowest pricePrice + qualifications
Evaluation ComplexitySimpleComplex
TransparencyHigh (price is clear)Moderate (scoring varies)
Proposal EffortLowerHigher
Quality ConsiderationMinimum acceptableScored factor
Award TimelineFasterSlower
Small Contractor AccessEasier (price-only)Harder (experience valued)
Innovation PotentialLowHigher

When to Use Each Method

Low Bid Works Best When:

  • Scope is clearly defined with detailed specifications
  • Project complexity is low to moderate
  • Multiple qualified contractors are available
  • Budget constraints are primary concern
  • Design is complete before bidding
  • Legal requirements mandate low bid

Best Value Works Best When:

  • Project is complex or high-risk
  • Contractor qualifications significantly impact success
  • Schedule is critical
  • Innovation or alternative approaches are desired
  • Past performance indicates likely future results
  • Design-build or CM at Risk delivery

Contractor Strategies

Success requires different strategies for each procurement type:

Winning Low Bid Work

  • Efficiency: Focus on operational efficiency
  • Accuracy: Develop precise estimating capabilities
  • Selectivity: Bid projects matching your strengths
  • Volume: Maintain steady bidding activity
  • Relationships: Build subcontractor networks for pricing
  • Compliance: Ensure complete, responsive bids

Winning Best Value Work

  • Track Record: Build strong performance history
  • Team: Develop and retain talented staff
  • Proposals: Invest in proposal quality
  • Differentiation: Develop unique capabilities
  • References: Cultivate satisfied clients
  • Price Balance: Competitive price with strong qualifications

Key Success Factors

  • Understand evaluation criteria before bidding
  • Read RFP/IFB requirements carefully
  • Tailor approach to procurement method
  • Build capabilities that matter in best value
  • Maintain competitive pricing for low bid

Frequently Asked Questions

Can a higher-priced bid win in best value?

Yes, if qualifications sufficiently outweigh the price difference. The higher-priced proposal must score well enough on non-price factors to overcome the price disadvantage when weighted and combined. This is the essence of best value procurement.

Why do public entities still use low bid?

Many states legally require low bid for construction to ensure transparency and prevent favoritism. Low bid is also simpler to administer and harder to challenge. Some jurisdictions have updated laws to allow best value, but many have not.

Which method is better for contractors?

It depends on your competitive advantages. Efficient, price-competitive contractors may prefer low bid. Those with strong track records, experienced teams, and differentiated capabilities often prefer best value where those qualities are rewarded.

How should I price best value proposals?

Be competitive but not at the expense of quality. Price typically counts for 30-60% of evaluation. You can sometimes win with a higher price if qualifications are strong, but unreasonably high prices will hurt. Find the balance that maximizes your overall score.

Are best value evaluations subjective?

Partially. Evaluation criteria and weights are published, but scoring within categories involves judgment. Well-run procurements use multiple evaluators, clear scoring guidelines, and consensus processes to maintain objectivity.

Conclusion

Both low bid and best value procurement methods have their place in construction. Understanding when each is appropriate and how to compete effectively under each helps contractors develop winning strategies for diverse market conditions.

Key takeaways:

  1. Low bid rewards price competitiveness; best value rewards qualifications
  2. Understand which method is being used before developing strategy
  3. Build capabilities that succeed in both environments
  4. Best value is growing but low bid remains common in public sector
  5. Tailor your approach to each procurement's specific criteria

Find Construction Bid Opportunities

Ready to compete for both low bid and best value projects? ConstructionBids.ai aggregates public and private construction bids with AI-powered matching. Get daily digests of relevant opportunities delivered to your inbox.

Start Finding Bids →

Related Articles

Ready to Find Your Next Contract?

Get instant access to thousands of government construction bids with our AI-powered platform.

Get Started