Electrical contractors face unique challenges when bidding commercial and industrial projects. From complex specifications to rapidly changing material costs, successful electrical bidding requires a systematic approach that balances accuracy with competitive pricing.
Understanding Electrical Bid Documents
Before starting your takeoff, thoroughly review all bid documents to understand the full scope of electrical work required.
Key Documents to Review
Electrical drawings typically include:
- E-series sheets (electrical plans)
- Single-line diagrams
- Panel schedules
- Lighting plans and schedules
- Power plans
- Fire alarm and low-voltage systems
- Site electrical plans
Specifications to examine:
- Division 26 (Electrical)
- Division 27 (Communications)
- Division 28 (Electronic Safety and Security)
- Division 25 (Integrated Automation)
Identifying Scope Boundaries
One of the most critical aspects of electrical bidding is understanding where your scope begins and ends:
- Coordination with mechanical: Who provides power to HVAC equipment?
- Fire alarm interfaces: Is fire alarm included or a separate contract?
- Low-voltage systems: Security, data, and AV—included or excluded?
- Temporary power: Is construction temporary power part of your scope?
- Equipment connections: Final connections vs. rough-in only
Electrical Takeoff Best Practices
Accurate quantity takeoffs form the foundation of competitive electrical bids.
Systematic Takeoff Approach
1. Start with the one-line diagram Review the electrical distribution system from service entrance to final branch circuits. This gives you an overview of:
- Service size and configuration
- Transformer requirements
- Distribution equipment
- Emergency/standby power systems
2. Count and measure systematically Work through drawings in a logical order:
- Lighting fixtures and controls
- Receptacles and devices
- Branch circuit wiring
- Feeders and distribution
- Special systems (fire alarm, data, etc.)
3. Use color-coded takeoffs Develop a consistent color system to track what's been counted:
- Green: Counted and verified
- Yellow: Needs clarification
- Red: Potential issue or conflict
Common Takeoff Mistakes to Avoid
- Missing concealed work: Always account for routing through walls, ceilings, and underground
- Underestimating wire lengths: Add 10-15% for routing, terminations, and waste
- Forgetting small items: Junction boxes, connectors, supports, and hardware add up
- Ignoring site conditions: Existing conditions may require additional labor
Labor Productivity Factors
Labor typically represents 40-60% of an electrical bid. Accurate labor estimates require understanding productivity factors.
Base Labor Units
Develop labor units for common tasks based on your company's historical data:
| Task | Labor Hours per Unit | |------|---------------------| | Install 4" EMT conduit | 0.12 hrs/ft | | Pull #12 THHN wire | 0.015 hrs/ft | | Install duplex receptacle | 0.45 hrs/ea | | Install 2x4 LED troffer | 0.65 hrs/ea | | Install 200A panel | 8.0 hrs/ea |
Productivity Adjustments
Apply adjustment factors based on project conditions:
Building type factors:
- New construction (base): 1.0
- Occupied renovation: 1.3-1.5
- Industrial facility: 1.1-1.2
- Healthcare (infection control): 1.4-1.6
Working condition factors:
- Standard conditions: 1.0
- High ceilings (over 12'): 1.15-1.25
- Congested areas: 1.2-1.3
- Outdoor work: 1.1-1.2
- Night shift premium: 1.15-1.2
Material Pricing Strategies
Electrical material costs can fluctuate significantly. Develop strategies to protect your margins.
Getting Competitive Quotes
- Request quotes from multiple electrical distributors
- Specify exact manufacturers and catalog numbers
- Ask for project-specific pricing vs. list price
- Negotiate payment terms and delivery schedules
- Verify lead times for long-lead items
Protecting Against Price Volatility
Copper and aluminum pricing: Wire and cable costs follow commodity markets. Consider:
- Material escalation clauses for projects over 6 months
- Locking prices with distributors when possible
- Building contingency into volatile material categories
Supply chain considerations:
- Switchgear and transformers: 16-52 week lead times
- Specialty fixtures: 8-16 week lead times
- Standard materials: 1-4 week availability
Electrical Subcontractor Management
Most electrical contractors use specialty subcontractors for portions of work.
Common Electrical Subcontracts
- Fire alarm systems
- Data/telecommunications cabling
- Security and access control
- Audio-visual systems
- Lightning protection
- Medium voltage work
Evaluating Sub Quotes
When receiving subcontractor quotes, verify:
- Scope matches your bid requirements
- All required systems and devices included
- Testing and commissioning included
- Warranty terms meet specifications
- Required certifications and licenses
Bid Day Procedures for Electrical Contractors
Electrical bids often come down to the wire. Establish procedures for bid day success.
Pre-Bid Day Preparation
One week before:
- Complete base takeoff and pricing
- Identify outstanding questions
- Submit final RFIs
- Request final sub quotes
Day before bid:
- Review all addenda carefully
- Verify material pricing is current
- Confirm sub quotes are final
- Prepare bid form and required documents
Bid Day Workflow
Morning activities:
- Final review of takeoff for errors
- Check for last-minute addenda
- Collect final sub quotes
Afternoon activities:
- Level subcontractor quotes
- Make final pricing decisions
- Calculate overhead and profit
- Complete bid form
Final hour:
- Management review and approval
- Submit bid (electronic or physical)
- Confirm receipt
Pricing Strategy and Markup
Determining the right markup requires understanding your costs and the competitive landscape.
Cost Categories
Direct costs:
- Labor (including burden)
- Materials
- Equipment and tools
- Subcontractors
Indirect costs:
- Project supervision
- Job site expenses
- Permits and fees
- Insurance (project-specific)
Overhead allocation:
- Office expenses
- Estimating department
- Management salaries
- Equipment depreciation
Markup Considerations
Markup percentages vary based on:
- Project size and complexity
- Competition level
- Risk factors
- Relationship with owner/GC
- Current workload
Typical electrical contractor markups range from 10-25% depending on these factors.
Value Engineering Opportunities
Identify value engineering options to make your bid more competitive while maintaining quality.
Common VE Options for Electrical
- Alternative fixture manufacturers
- Conduit type substitutions (EMT vs. MC cable)
- Reduced panel sizes where code permits
- Occupancy sensor vs. manual switching
- Standard vs. premium efficiency transformers
Presenting Alternatives
When offering alternatives:
- Provide base bid as specified
- List alternatives separately with cost savings
- Explain any performance differences
- Confirm code compliance
Post-Bid Activities
Your work doesn't end when the bid is submitted.
Following Up
- Confirm bid was received and opened
- Request feedback if not awarded
- Ask about bid results and rankings
- Document lessons learned
Preparing for Award
If you're the apparent low bidder:
- Be ready for scope clarification meetings
- Have bonding capacity available
- Prepare for contract negotiations
- Begin procurement planning
Technology in Electrical Estimating
Modern estimating tools improve accuracy and efficiency.
Software Options
Takeoff software:
- On-Screen Takeoff
- Bluebeam Revu
- PlanSwift
- Trimble
Estimating databases:
- Accubid/Trimble
- McCormick Systems
- ConEst
- Electrical bid management platforms
Building Your Database
Maintain historical data for:
- Labor productivity by task
- Material cost trends
- Project final costs vs. estimates
- Subcontractor performance
Winning More Electrical Bids
Success in electrical bidding comes from consistent execution of fundamentals.
Keys to Success
- Accurate takeoffs: Double-check quantities and verify scope
- Competitive pricing: Build relationships with suppliers
- Reliable subcontractors: Vet your specialty contractors
- Professional presentation: Well-organized bid packages
- Timely submission: Never miss a deadline
Building Relationships
Long-term success depends on relationships with:
- General contractors who bid your target projects
- Electrical distributors for competitive pricing
- Specialty subcontractors for complete packages
- Project owners for negotiated work