Historical Renovation Bidding Challenges and Strategies
Historic renovation projects represent both exceptional opportunities and unique challenges. These projects often carry higher profit margins but also greater risks. Success requires understanding preservation requirements, managing unknowns, and pricing appropriately for the complexity involved.
Understanding Historic Preservation Requirements
Secretary of Interior's Standards
The foundation for historic preservation work:
The Ten Standards for Rehabilitation
- Use property for historic purpose or compatible new use
- Retain historic character
- Recognize property as physical record of time
- Preserve distinctive materials and features
- Preserve distinctive features, finishes, and construction techniques
- Repair rather than replace deteriorated features
- Treat sensitively any chemical or physical treatments
- Protect archaeological resources
- Make new work compatible but distinguishable
- Make new work reversible where possible
State Historic Preservation Office (SHPO)
SHPO Involvement:
- Reviews and approves work scopes
- Monitors construction for compliance
- Certifies work for tax credit eligibility
- Can require changes during construction
Timeline Considerations:
- Review periods can extend schedules
- Multiple review cycles possible
- Mock-ups may be required
- Final approval needed for completion
National Park Service Requirements
For projects using federal historic tax credits:
Part 1: Establishes historic significance Part 2: Describes proposed work (submitted before construction) Part 3: Certifies completed work meets standards
Unique Bidding Challenges
Unknown Existing Conditions
Historic buildings hide surprises:
Common Hidden Conditions:
- Structural deficiencies behind finishes
- Previous repairs done improperly
- Hazardous materials (asbestos, lead, PCBs)
- Deteriorated concealed elements
- Non-standard or obsolete construction
Assessment Strategies:
- Request exploratory demolition before bid
- Conduct thorough existing conditions survey
- Review available historic documents
- Interview previous building users
- Engage preservation specialists
Material Matching Challenges
Replicating historic materials:
| Historic Material | Matching Challenge | Cost Premium | |-------------------|-------------------|--------------| | Ornamental plaster | Skilled craftsmen rare | 3-5x standard | | Historic brick | Match color, texture, size | 2-3x standard | | Wood windows | Custom fabrication | 4-6x replacement | | Terra cotta | Limited suppliers | 5-10x modern | | Cast iron | Pattern making required | Variable |
Skilled Labor Requirements
Historic work requires specialized skills:
Specialty Trades Needed:
- Ornamental plasterers
- Historic masons
- Wood craftsmen
- Architectural metalworkers
- Specialty painters (graining, gilding)
- Stained glass artisans
Labor Considerations:
- Limited availability
- Higher hourly rates
- Travel costs from distant locations
- Apprentice to journeyman ratios
- Training time for unfamiliar techniques
Estimating Historic Projects
Investigation Before Pricing
Invest in understanding the building:
Pre-Bid Investigation:
- Conduct thorough site visit
- Document existing conditions photographically
- Request access to concealed areas
- Review any existing testing reports
- Identify hazardous materials
- Map existing utilities
Research Historic Documentation:
- Original construction drawings
- Previous renovation records
- Historic photographs
- Sanborn maps
- Building permits history
Contingency Factors
Historic projects require higher contingencies:
Recommended Contingency Ranges: | Project Complexity | Contingency Range | |-------------------|-------------------| | Well-documented, minor intervention | 10-15% | | Moderate unknowns, significant restoration | 15-25% | | Major unknowns, complex restoration | 25-35% | | Severely deteriorated, minimal documentation | 35-50% |
Unit Price Strategies
Use unit prices for uncertain quantities:
Common Unit Price Items:
- Wood repair per linear foot
- Masonry repointing per square foot
- Paint removal per square foot
- Structural reinforcement per location
- Hazmat remediation per quantity
Unit Price Benefits:
- Reduces risk on unknowns
- Provides clear change order basis
- Enables fair owner/contractor cost sharing
Allowance Strategies
Include allowances for undefined work:
Typical Allowance Items:
- Structural repairs: $XX,XXX
- Concealed wood replacement: $XX,XXX
- Masonry restoration beyond visible: $XX,XXX
- Hazmat remediation: $XX,XXX
- Specialty finish matching: $XX,XXX
Document Allowance Assumptions:
- What's included in base bid
- What allowance covers
- How unused allowance is handled
- Change order process for exceeding allowance
Tax Credit Project Requirements
Federal Historic Tax Credits
20% credit for certified rehabilitation:
Eligibility Requirements:
- Building listed on National Register (or contributing)
- Substantial rehabilitation test met
- Work meets Secretary's Standards
- Property placed in service in qualified use
Impact on Bidding:
- SHPO review adds time
- NPS certification required
- Work must meet strict standards
- Documentation requirements extensive
State Historic Tax Credits
Many states offer additional credits:
State Program Considerations:
- Additional review requirements
- Potentially different standards
- Separate application process
- May stack with federal credits
Certification Risk
Understand the stakes:
If Work Not Certified:
- Tax credits denied
- Owner financial impact severe
- Contractor liability potential
- Reputation damage
Mitigation Strategies:
- Engage qualified preservation consultant
- Submit for approval before work
- Document all work thoroughly
- Maintain open SHPO communication
Managing Historic Project Execution
Preservation Oversight
Work with preservation professionals:
Architect of Record
- Must understand preservation standards
- Experience with SHPO process
- Ability to design appropriate solutions
- Understanding of historic materials
Preservation Consultant
- May be separate from architect
- Advises on standards compliance
- Reviews submittals and mock-ups
- Coordinates with SHPO
Mock-Ups and Samples
Expect extensive approval processes:
Common Mock-Up Requirements:
- Mortar color and profile for repointing
- Paint colors (often requires many samples)
- Replacement material matches
- Cleaning techniques
- Repair methodologies
Build Mock-Up Time Into Schedule:
- Sample preparation: 1-2 weeks
- Review period: 2-4 weeks
- Revisions if needed: 1-2 weeks
- Typical total: 4-8 weeks
Documentation Requirements
Historic projects require extensive records:
During Construction:
- Photographs before, during, and after
- Material samples and sources
- Craft technique documentation
- Change documentation with justification
For Tax Credit Certification:
- Completed work photos
- Material specifications
- Contractor qualifications
- Test reports
- Proof of costs for substantial rehabilitation
Risk Allocation for Historic Projects
Contract Considerations
Owner Responsibilities:
- Provide access for investigation
- Supply available historic documentation
- Fund exploratory demolition
- Assume risk for unknown conditions (ideally)
- Manage SHPO relationship
Contractor Responsibilities:
- Execute work per approved plans
- Follow Secretary's Standards
- Obtain required approvals for changes
- Document work for certification
- Maintain quality workmanship
Insurance Requirements
Special Coverage Needs:
- Higher liability limits
- Valuable historic property endorsement
- Course of construction coverage
- Professional liability (if design-assist)
- Contractor's pollution liability
Bonding Considerations
Bonding Challenges:
- Higher perceived risk
- Less predictable costs
- Surety unfamiliarity with preservation
- Solution: Build relationship with surety, demonstrate experience
Building Historic Preservation Expertise
Developing Capabilities
Training Investments:
- Preservation technology courses
- Secretary's Standards training
- Material conservation workshops
- SHPO process familiarization
Craft Skill Development:
- Apprenticeship programs
- Work with specialty subcontractors
- In-house training programs
- Trade organization involvement
Market Development
Relationship Building:
- Connect with preservation architects
- Join preservation organizations
- Network with SHPO staff
- Build owner relationships
Portfolio Development:
- Document completed projects thoroughly
- Obtain owner testimonials
- Create case studies
- Photograph before and after
Platforms like ConstructionBids.ai can help identify historic renovation opportunities and track the specialized requirements of preservation projects.
Conclusion
Historic renovation bidding requires specialized knowledge and careful risk management. Success depends on:
- Understanding preservation standards: Know the rules before bidding
- Thorough investigation: Never bid blind on historic buildings
- Appropriate contingencies: Price for the unknowns
- Skilled labor access: Secure specialty craftspeople early
- Strong documentation: Protect yourself and the project
The rewards for contractors who master historic renovation include higher margins, differentiated market position, and deeply satisfying project work. Start building your expertise by pursuing smaller historic projects and partnering with experienced preservation professionals.