Construction Bid Document Review Checklist: What to Look For
Thorough bid document review is the foundation of accurate estimating. Missing a specification requirement or overlooking a contract clause can turn a winning bid into a losing project. Use this comprehensive checklist to ensure you catch everything important.
Initial Document Inventory
Verify Complete Package
Before starting review, confirm you have:
- [ ] Invitation to Bid / Advertisement
- [ ] Instructions to Bidders
- [ ] Bid Form and required schedules
- [ ] Contract Agreement form
- [ ] General Conditions
- [ ] Supplementary Conditions
- [ ] Technical Specifications
- [ ] Drawings (all sheets)
- [ ] All addenda issued
- [ ] Reference documents mentioned
Check Document Dates
- [ ] Verify drawing dates are consistent
- [ ] Confirm specification sections match drawing set
- [ ] Check for "Not for Construction" stamps
- [ ] Note any superseded documents
- [ ] Verify addenda received matches count issued
Instructions to Bidders Review
Bid Submission Requirements
- [ ] Submission deadline (date AND time)
- [ ] Submission location (physical or electronic)
- [ ] Required number of copies
- [ ] Bid security requirements (amount, form)
- [ ] Required bid form (no modifications allowed?)
- [ ] Licenses and certifications required
- [ ] Pre-qualification requirements
Evaluation Criteria
- [ ] Basis of award (low bid, best value, etc.)
- [ ] How alternates affect award
- [ ] Qualifications evaluation criteria
- [ ] Interview or presentation requirements
Important Dates
- [ ] Pre-bid meeting (mandatory or optional?)
- [ ] Site visit dates
- [ ] Question deadline
- [ ] Addenda issuance deadline
- [ ] Bid opening date/time
- [ ] Expected award date
- [ ] Contract execution deadline
- [ ] Notice to proceed timing
Contract Document Review
Agreement Form
- [ ] Contract type (lump sum, unit price, GMP, etc.)
- [ ] Payment terms
- [ ] Retainage percentage and release terms
- [ ] Contract time (calendar days, working days, completion date)
- [ ] Liquidated damages amount
- [ ] Bonus provisions (if any)
General and Supplementary Conditions
- [ ] Insurance requirements (limits, additional insureds)
- [ ] Bonding requirements
- [ ] Indemnification provisions
- [ ] Warranty requirements
- [ ] Change order procedures
- [ ] Dispute resolution process
- [ ] Termination provisions
- [ ] Owner's right to audit
- [ ] Assignment restrictions
- [ ] Prevailing wage requirements
- [ ] Safety requirements
- [ ] Quality control/quality assurance requirements
- [ ] Submittal procedures
- [ ] Testing and inspection requirements
Risk Allocation Items
- [ ] Differing site conditions clause
- [ ] Delay damage provisions
- [ ] Force majeure definition
- [ ] No-damage-for-delay clauses
- [ ] Consequential damages waiver
- [ ] Weather day provisions
- [ ] Unknown conditions handling
Drawing Review Checklist
General Drawing Review
- [ ] Index sheet lists all drawings
- [ ] Drawing scale is noted
- [ ] North arrow orientation consistent
- [ ] Match lines coordinate between sheets
- [ ] Abbreviations list provided
- [ ] Symbol legend complete
- [ ] General notes reviewed
Site/Civil Drawings
- [ ] Property boundaries defined
- [ ] Existing conditions shown
- [ ] Demolition scope clear
- [ ] Earthwork quantities identifiable
- [ ] Utility locations shown
- [ ] Stormwater management defined
- [ ] Paving and hardscape detailed
- [ ] Landscaping scope defined
- [ ] Site access and staging areas identified
Architectural Drawings
- [ ] Floor plans complete for all levels
- [ ] Building sections adequate
- [ ] Wall sections detailed
- [ ] Door and window schedules complete
- [ ] Finish schedules provided
- [ ] Millwork details included
- [ ] Ceiling plans coordinated
- [ ] Exterior elevations detailed
- [ ] Waterproofing details shown
Structural Drawings
- [ ] Foundation plans complete
- [ ] Framing plans for all levels
- [ ] Connection details provided
- [ ] Reinforcing schedules complete
- [ ] Special inspections identified
- [ ] Structural steel schedules complete
- [ ] Coordination with architectural confirmed
MEP Drawings
- [ ] Mechanical plans complete
- [ ] Electrical plans complete
- [ ] Plumbing plans complete
- [ ] Fire protection plans complete
- [ ] Equipment schedules provided
- [ ] Riser diagrams included
- [ ] Panel schedules complete
- [ ] Fixture schedules provided
- [ ] Coordination between disciplines verified
Specification Review Checklist
Division 01 - General Requirements
- [ ] Summary of work
- [ ] Allowances specified
- [ ] Unit prices required
- [ ] Alternates described
- [ ] Contract modification procedures
- [ ] Payment procedures
- [ ] Project meetings requirements
- [ ] Submittal requirements
- [ ] Quality control requirements
- [ ] Temporary facilities requirements
- [ ] Product requirements
- [ ] Execution requirements
- [ ] Closeout requirements
- [ ] Warranty requirements
Technical Specifications
For each relevant section:
- [ ] Scope of work defined
- [ ] Related work identified
- [ ] Products specified (proprietary or equal?)
- [ ] Substitution procedures
- [ ] Quality assurance requirements
- [ ] Submittals required
- [ ] Delivery, storage, handling requirements
- [ ] Execution requirements
- [ ] Protection and cleaning requirements
- [ ] Warranty terms
Critical Specification Items
- [ ] Specified products available?
- [ ] Lead times for specified items
- [ ] Testing requirements identified
- [ ] Special certifications needed
- [ ] Training requirements
- [ ] Spare parts/attic stock requirements
- [ ] O&M manual requirements
- [ ] As-built documentation requirements
Questions and Clarifications
Track Issues Found
Document items needing clarification:
| Item | Document Reference | Question | Submitted | Response | |------|-------------------|----------|-----------|----------| | 1 | Spec 07920, para 2.1 | Sealant color not specified | 12/10 | Add. 2 | | 2 | A-301 vs S-101 | Wall dimension conflict | 12/10 | Add. 2 |
RFI Best Practices
- [ ] Submit questions before deadline
- [ ] Reference specific documents/locations
- [ ] Ask clear, specific questions
- [ ] Request written response
- [ ] Track all questions and responses
- [ ] Incorporate responses in estimate
Scope Definition Checklist
What's Included
Verify you understand:
- [ ] Limits of work clearly defined
- [ ] Interface with other contracts understood
- [ ] Owner-furnished items identified
- [ ] Permits to be obtained (by whom?)
- [ ] Temporary utilities responsibility
- [ ] As-built/record drawing requirements
- [ ] Cleaning requirements
- [ ] Final inspection requirements
What's Excluded
Look for explicit exclusions:
- [ ] Work by others on same site
- [ ] Owner-provided equipment
- [ ] Future work provisions
- [ ] Items shown for reference only
- [ ] Deferred scopes
Gray Areas
Identify ambiguous scope:
- [ ] "By others" without specifying who
- [ ] Unclear coordination requirements
- [ ] Missing details
- [ ] Specification/drawing conflicts
- [ ] Assumed existing conditions
Pre-Bid Due Diligence
Site Visit Checklist
- [ ] Access routes and restrictions
- [ ] Staging area availability
- [ ] Existing conditions documentation
- [ ] Subsurface conditions visible
- [ ] Adjacent property considerations
- [ ] Utility availability and locations
- [ ] Working hour restrictions
- [ ] Security requirements
- [ ] Parking limitations
- [ ] Material delivery constraints
Research Checklist
- [ ] Permit requirements verified
- [ ] Utility company requirements researched
- [ ] Labor market conditions assessed
- [ ] Material availability confirmed
- [ ] Subcontractor interest/availability
- [ ] Similar project costs referenced
- [ ] Owner payment history researched
Final Bid Preparation Checklist
Before Submission
- [ ] All addenda acknowledged
- [ ] Bid form completed correctly
- [ ] All blanks filled in (or marked N/A)
- [ ] Prices in words and figures match
- [ ] Arithmetic verified
- [ ] Bid security enclosed
- [ ] Required attachments included
- [ ] Proper signatures obtained
- [ ] Submission format correct
Quality Check
- [ ] Independent estimate review completed
- [ ] Major quantities verified
- [ ] Subcontractor coverage confirmed
- [ ] Material pricing current
- [ ] Schedule assumptions reasonable
- [ ] Contingency appropriate for risk
- [ ] Markup reviewed for competitiveness
Conclusion
Systematic bid document review catches issues that rush estimating misses. Use this checklist as a starting point and customize it for your business and project types.
The time invested in thorough document review pays dividends through more accurate estimates, fewer surprises during construction, and better project outcomes. Build document review discipline into your estimating process.
Remember: if something is unclear, ask. It's always better to clarify during bidding than to discover problems after award. Your questions benefit all bidders and result in better projects for everyone.