Skip to main content
Back to Command Center
BiddingOther

SC State Portal

Greenville-Poinsett Bridge HP Callahan Creek Stream Restoration

Due Date

Dec 3, 2026, 2:00 PM EST

Bid ID

P24-6038-CB

Location

SC

Bid Details

Stream restoration incl. channel realignment, excavation, in-stream log and rock structures, habitat enhancements, erosion control, and riparian vegetation. | Category: Construction | Location: Callahan Mtn Rd, Travelers Rest, SC 29690 | Delivery method: Design-Bid-Build | Construction cost range: N/A | Documents from: Engineering@dnr.sc.gov | State: SC