Back to Command Center
BiddingOther
VIA Metropolitan Transit
Civil Design Engineering Services IDIQ
Due Date
Nov 12, 2026, 2:00 PM CST
Bid ID
26-403
Location
TX
Bid Details
Public open listing and receipt verified. Full solicitation packet, complete eligibility and unreviewed amendments UNKNOWN; consult the owner before bidding. Public special requirements: Prior to the time and date indicated above, Proposers shall utilize the B2Gnow online bidding platform to submit the proposal in response to this solicitation. VIA will not accept physical VIA is seeking contractors for an indefinite delivery, indefinite quantity (IDIQ) to provide the following services through self-performing or subcontracting (services are not limited to): a) Civil Engineering Services; b) Surveying Services; c) Geotechnical Engineering Services; d) Structural Engineering Services; e) Mechanical Engineering Services; f) Materials Testing Services; g) Electrical Engineering Services; h) Plumbing Services; andi) Fire Alarm System Services. | State: TX | Buyer: VIA Metropolitan Transit
Documents & Links
- View
Civil Design Engineering Services IDIQ solicitation detail
tenderNotice