Back to Command Center
BiddingOther
University of California, Los Angeles
RRUMC Room 2128 IR-2 Equipment Replacement
Due Date
Jan 19, 2027
Bid ID
907105.01
Location
CA
Bid Details
RRUMC Room 2128 IR-2 Equipment Replacement. Mandatory pre-bid conference: A mandatory Pre-Bid Conference will be conducted on December 1, 2026. A mandatory Pre-Bid Job Walk will be conducted on December 2, 2026 Only bidders who participate in both the Conference and the Job Walk, in their entirety, will be allowed to bid on the Project as prime contractors. License requirements: The successful Bidder will be required to have the following California current and active contractor's license at the time of submission of the Bid: B License (General Building) PREQUALIFICATION: To be allowed to submit a bid, Bidders must have the minimum experience set forth in the Prequalification Questionnaire contained in the Bidding Documents and posted on the UCLA Online Planroom website. Bidder's completed Prequalification Questionnaire must be uploaded to the UCLA Online Planroom website, no later than: 3:00 p.m., December 9, 2026 BID DEADLINE: must be received at or before 2:00 p.m., January 19, 2027. Calendar precision; notice clock has no independently established zone. The Radiology Department at UCLA Health proposes the installation of a new single-plane Interventional Radiology (IR) system and the renovation of IR Procedure Room 2128, Control Room 2144-28, Equipment Room 2128A, and a small portion of Corridor 2132CO on the second floor of Ronald Reagan UCLA Medical Center (RRUMC). The corridor modifications are required to provide code-compliant clearance for the new IR equipment. The total project area is approximately 922 gross square feet (gsf) (838 assignable square feet [asf]). The scope of work includes interior demolition; installation and anchorage of the new IR equipment, including associated structural reinforcement; upgrades to floor, wall, an | State: CA | Buyer: University of California, Los Angeles
Documents & Links
- View
RRUMC Room 2128 IR-2 Equipment Replacement solicitation detail
tenderNotice