Skip to main content
Back to Command Center
Bidding

Renewable Water Resources

Georges Creek WRRF EQ Upgrades Division I RFB

Due Date

Nov 2, 2026

Bid ID

605

Location

SC

Bid Details

The project consists of constructing a concrete liner in an existing 6-MG flow equalization basin, installing basin fill and drain piping, installing floating mixers in the basin, installing associated electrical and instrumentation and controls components, and associated site work. The force main and associated control valving to control flow to and from the basin are being constructed under a separate contract (Division II).