Skip to main content
Back to Command Center
Bidding

City of Moreno Valley

General Contractor On-Call Services for The City of Moreno Valley

Due Date

Nov 24, 2026, 2:00 PM PST

Bid ID

2026-019

Location

CA

Bid Details

General building contractor services to include all labor, equipment, materials, and performance of operations in connection with construction, repair, maintenance services, and potential preventive maintenance services on an on-call basis. Trades shall include, but are not limited to, minor construction; asphalt/ concrete; ceramic and mosaic tile; storefront doors; drywall, lathing, and plastering; electrical; fencing; finish carpentry; flooring; framing and rough carpentry; locksmith; painting; plumbing; roofing; sheet metal and welding; window/glass/tint; commercial doors/ gates; and asbestos and hazardous substance abatement. Certain maintenance may require scheduled preventive maintenance work.