Back to Command Center
Bidding
San Diego County Regional Airport Authority
Triturator Drainage Upgrade
Due Date
Nov 2, 2026
Bid ID
104274FC
Location
CA
Bid Details
The project consists of a limited renovation within the existing Triturator building, encompassing approximately 1,870 gross square feet (GSF) with no change to the existing building square footage. The scope includes modifications to the existing concrete slab-on-grade to accommodate regrading, improved drainage, and installation of the proposed grinder equipment. All work will be confined to the building interior; no exterior modifications or improvements are part of this scope.