Skip to main content
Back to Command Center
BiddingRFQ

Loudoun County, VA

Construction of the Dulles West Boulevard, RFQ 704022

Due Date

Dec 17, 2026, 4:00 PM EST

Bid ID

RFQ 704022

Location

VA

Bid Details

The Intent of this Invitation for Bid (IFB) is for the County of Loudoun, Virginia (“County”) to obtain the services of a qualified Contractor (“Contractor”) to construct Dulles West Boulevard (the “Project”). Dulles West Boulevard consists of a four (4)-lane median-divided roadway connecting Northstar Boulevard and Arcola Boulevard. The length is approximately 4,400 linear feet with ten (10)-foot-wide shared-use paths on both sides of the road. The Project includes two (2) signalized intersections at Stone Springs Boulevard and Arcola Boulevard (existing), roadway improvements to Stone Springs Boulevard, as well as two (2) new stormwater management facilities and two (2) major culvert crossings. The general scope of work includes, but is not limited to, all surveying, construction layout, maintenance of traffic, earthwork (including the removal of unsuitable material), rock excavation, erosion and sediment control, other environmental controls, safety procedures, and complete compliance with all applicable permits, to include but not be limited to, Virginia Stormwater Management Program (VSMP)/Stormwater Pollution Prevention Plan (SWPPP) requirements, Virginia Department of Transportation (VDOT) Land Use permits, and other environmental permits.Pre-Bid Conference: An optional Pre-Bid Conference will be held virtually via Microsoft Teams on November 24, 2026, at 11:00 a.m. | Category: Procurement | Contact: Nebila Kurtu, NIGP-CPP, CPPB, VCCO, FMPPlease see the attached document RFQ 704022 for additional contact information. | Buyer: Loudoun County, VA